Long Life Extrusion Plastic Profile Pipe Mould Tooling/Mould Die

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece Negotiable

Sepcifications

  • Shaping Mode Extrusion Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material PVC PP PE PPR WPC
  • Process Combination Type Compound Die
  • Application Extrusion Machine
  • Runner Hot Runner
  • Certification CE
  • Customized Customized
  • Trademark Midtech
  • Origin China

Product Description

Plastic extrusion mould die head Product description: Feature: 1.Using the overall flowing path core support structure. 2.Using the removable locating devices. 3.The channel design has avoided the dead area and retention. 4.The optimized design of the flowing channel gives it a ...

Learn More

Mould Comparison
Transaction Info
Price Negotiable US $ 9,000.00-13,000.00/ Piece US $ 9,000.00-13,000.00/ Piece US $ 9,000.00-13,000.00/ Piece US $ 10,000.00-19,000.00/ Piece
Min Order 1 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification CE ISO ISO ISO ISO
Management System Certification ISO 9001, ISO 9000 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, Africa North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Own Brand - - - -
Average Lead Time - Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Extrusion Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PVC PP PE PPR WPC;
Process Combination Type: Compound Die;
Application: Extrusion Machine;
Runner: Hot Runner;
Customized: Customized;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Supplier Name

Suzhou Midtech Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier