Specification |
Usage: Gas Storage;
Purpose: Gas Storage;
Parts: Gas Tank;
Application Fields: New Energy;
Machine Size: Customized;
Condition: New;
Material: Special Steel Plate;
Automation: Automatic;
|
Usage: Biogas;
Purpose: Gas Purification;
Parts: Valve;
Application Fields: New Energy;
Noise Level: Ultra Quiet;
Machine Size: Large;
Condition: New;
Diameter: 1.8m, 2.0m, 2.5m;
Capacity: ≤ 5000m³/Day;
Desulfurizer: Fe2o3, Feooh;
Feedstock Replacement Period: 3 to 6 Months;
|
Usage: Biogas;
Purpose: Gas Purification;
Parts: Valve;
Application Fields: New Energy;
Noise Level: Ultra Quiet;
Machine Size: Large;
Condition: New;
Diameter: 1.8m, 2.0m, 2.5m;
Height: 6m to 18m;
Material: Carbon Steel with Anti-Corrosion Treatment;
Quantity: 2, 4, 6, 8;
Capacity: ≤ 5000m³/Day;
Desulfurizer: Fe2o3, Feooh;
Feedstock Replacement Period: 3 to 6 Months;
Temperature: 60ºC;
Appearance Color: Customized;
Technical Support: Available;
|
Usage: Biogas;
Purpose: Gas Storage;
Parts: Gas Tank;
Application Fields: New Energy;
Noise Level: Ultra Quiet;
Machine Size: Large;
Condition: New;
Double Membrane Gas Storage Tank: Double Membrane Gas Storage Tank;
|
Usage: Biogas;
Purpose: Gas Purification;
Parts: Valve;
Application Fields: New Energy;
Noise Level: Ultra Quiet;
Machine Size: Large;
Condition: New;
Diameter: 1.8m, 2.0m, 2.5m;
Height: 6m to 18m;
Material: Carbon Steel with Anti-Corrosion Treatment;
Quantity: 2, 4, 6, 8;
Capacity: ≤ 5000m³/Day;
Desulfurizer: Fe2o3, Feooh;
Feedstock Replacement Period: 3 to 6 Months;
Temperature: 60ºC;
Appearance Color: Customized;
Technical Support: Available;
|