Durable Heat-Treated Engine Components Supplier

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Pieces US$3.20 / Piece

Sepcifications

  • Casting Method Vacuum Aspirated Casting
  • Process Lost Wax Casting
  • Molding Technics Pressure Casting
  • Application Forklift
  • Material Carbon Steel
  • Surface Preparation Polishing
  • Surface Roughness Ra0.2
  • Machining Tolerance +/-0.02mm
  • Standard GB
  • Certification ISO 9001:2008
  • Transport Package Requirements of Customer
  • Specification ISO9001
  • Trademark KM
  • Origin Ningbo Zhejiang China
  • Size What You Want
  • Surface Zinc, Sand Lasting, Painted
  • Heat 20-65HRC
  • Packing Wooden Box

Product Description

Welcome to Ningbo Yinzhou Ke Ming Machinery Manufacturing Co., Ltd. We are your premier foundry specializing in carbon steel, stainless steel, and iron casting parts tailored to your requirements. With over 2000 casted products, we guarantee top-notch quality. Our flexible small quantity ...

Learn More

High-Quality Engine Components Comparison
Transaction Info
Price US $ 3.2/ Piece US $ 8.00-10.00/ Piece US $ 8.00-10.00/ Piece US $ 8.00-10.00/ Piece US $ 8.00-10.00/ Piece
Min Order 500 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Paypal, Money Gram L/C, T/T, D/P, Paypal, Money Gram L/C, T/T, D/P, Paypal, Money Gram L/C, T/T, Western Union, Paypal, Money Gram, CASH
Quality Control
Product Certification ISO 9001:2008 CE, RoHS, ISO 9001:2000, ISO 9001:2008 CE, RoHS, ISO 9001:2000, ISO 9001:2008 CE, RoHS, ISO 9001:2000, ISO 9001:2008 CE, RoHS, ISO 9001:2000, ISO 9001:2008
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Domestic Domestic Domestic Domestic Domestic
Annual Export Revenue - - - - -
Business Model OEM OEM OEM OEM OEM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Casting Method: Vacuum Aspirated Casting;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Forklift;
Material: Carbon Steel;
Surface Preparation: Polishing;
Surface Roughness: Ra0.2;
Machining Tolerance: +/-0.02mm;
Standard: GB;
Size: What You Want;
Surface: Zinc, Sand Lasting, Painted;
Heat: 20-65HRC;
Packing: Wooden Box;
Casting Method: Directional Crystallization;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Stainless Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra0.8;
Machining Tolerance: +/-0.10mm;
Standard: ANSI;
Pump Impeller Delivery Time: 30 Days;
Pump Impeller Machining: CNC Machining;
Pump Impeller Samples: Can Be Sent Firstly for Customer's Testing;
Pump Impeller Material: Stainless Steel, Alloy Steel, Titanium;
Pump Impeller Certificate: BV and ISO 9001;
Casting Method: Vacuum Aspirated Casting;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Alloy Steel;
Surface Preparation: Spray-Paint;
Surface Roughness: Ra0.1;
Machining Tolerance: +/-0.02mm;
Standard: ANSI;
Pump Casing Delivery Time: 30 Days;
Pump Casing Machining: CNC Machining;
Samples: Can Be Sent Firstly for Customer's Testing;
Pump Casing Material: Stainless Steel, Alloy Steel, Titanium;
Certificate: BV and ISO 9001;
Casting Method: Vacuum Aspirated Casting;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Alloy Steel;
Surface Preparation: Spray-Paint;
Surface Roughness: Ra0.1;
Machining Tolerance: +/-0.02mm;
Standard: ANSI;
Pump Casing Delivery Time: 30 Days;
Pump Casing Machining: CNC Machining;
Samples: Can Be Sent Firstly for Customer's Testing;
Pump Casing Material: Stainless Steel, Alloy Steel, Titanium;
Certificate: BV and ISO 9001;
Casting Method: Vacuum Aspirated Casting;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Alloy Steel;
Surface Preparation: Spray-Paint;
Surface Roughness: Ra0.1;
Machining Tolerance: +/-0.02mm;
Standard: ANSI;
Pump Casing Delivery Time: 30 Days;
Pump Casing Machining: CNC Machining;
Samples: Can Be Sent Firstly for Customer's Testing;
Pump Casing Material: Stainless Steel, Alloy Steel, Titanium;
Certificate: BV and ISO 9001;
Supplier Name

Ningbo Yinzhou Ke Ming Machinery Manufacturing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zibo Qingdong Machinery Manufacturing Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zibo Qingdong Machinery Manufacturing Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zibo Qingdong Machinery Manufacturing Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zibo Qingdong Machinery Manufacturing Co., Ltd.

China Supplier - Gold Member Audited Supplier