Specification |
After-sales Service: Video Technical/Online Support,Send Engineer;
Warranty: 2 Years;
Service Life: <15 Years;
Voltage: 380V, 50Hz, 3phases, 380V, 50Hz, 3phases;
Structure: Vertical;
Function: Rubber Cutting Machine;
Power: 18.5kw;
Capacity: 65PCS/H;
Power Source: Electric;
Type: Tire Recycling Machine;
Automatic Grade: Semiautomatic;
Dimension(L*W*H): 1800*1500*1200mm;
Weight: 1700kgs;
Local Service Location: Saudi Arabia, Indonesia, Russia, Thailand, Morocco;
Color: Blue/Green/Gray;
Electric Wire Separator: Tire Steel Wire Separator;
Tyre/Tire Steel Wire Separator: Stainless Steel Separator;
Applicable Industries: Manufacturing Plant;
|
After-sales Service: All The Countries in 24 Hours;
Warranty: 2 Years;
Service Life: ≥15 Years;
Voltage: 380V;
Structure: Horizontal;
OEM/ODM: OEM/ODM;
Capacity: 10-25tons/Day;
Fuel: Wood, Coal, Natural Gas, Fule Oil;
Material: Tyre, Plastic, Rubber, etc;
Power: 10-15kw;
Total Weight: 25-32tons;
Oil Output(Tyre for Example): 40%~45%;
Type of Tire Machinery: Oil Extracting From Tires;
Heating Way: Direct Heating /Indirect Heating;
Installation: Assembled Boiler;
|
Warranty: 2 Years;
Service Life: ≥15 Years;
Voltage: 380V;
Structure: Horizontal;
Capacity: 10-25tons/Day;
Material: Tyre, Plastic, Rubber, etc;
Fuel: Wood, Coal, Natural Gas, Fule Oil;
Power: 10-15kw;
Total Weight: 25-32tons;
Oil Output(Tyre for Example): 40%~45%;
Type of Tire Machinery: Oil Extracting From Tires;
Heating Way: Direct Heating /Indirect Heating;
Installation: Assembled Boiler;
|
Warranty: 2 Years;
Service Life: ≥15 Years;
Voltage: 380V;
Structure: Horizontal;
Capacity: 10-25tons/Day;
Material: Urban Waste etc.;
Fuel: Wood, Coal, Natural Gas, Fule Oil;
Power: 10-15kw;
Total Weight: 25-32tons;
Oil Output(Tyre for Example): 40%~45%;
Type of Tire Machinery: Oil Extracting From Urban Waste;
Heating Way: Direct Heating /Indirect Heating;
Installation: Assembled Boiler;
|
After-sales Service: Life Long;
Warranty: 1 Year;
Service Life: ≥15 Years;
Voltage: 380V;
Structure: Horizontal;
Name: Rubber Powder Production Line;
Color: as Your Requirement;
Condition: New;
Delivery Time: Within 55 Working Days After Receiving The Deposit;
|