Master Link Assembly
US$0.55-6.99 / Piece
View
  • Recommend for you
  • What is Factory Supplied Metal Triangle Ring with ISO 9001
  • What is Rigging Hardware G80 Alloy Steel Master Link for Connecting
  • What is European Type Forged G80 Welded Chain Master Link

What is A345 G80 Master Link Assembly for Chain Slings

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$0.55-6.99 / Piece

Sepcifications

  • Transport Package Packed in Wooden Case, Then in Pallets.
  • Specification 3/4"~3"
  • Trademark First Rigging
  • Origin Shandong China
  • Surface Treatment Zinc Plated,Powder Coated
  • Color Red ,Yellow ,Blue
  • Material Carbon Steel
  • Size 3/4"~3"
  • Product Name Master Link Assembly
  • Trade Term Fob, CFR, CIF
  • Process Drop Forged
  • Use Lifting, Lifting Point, Lashing
  • Inspection Mill Test Certificate Can Be Provided
  • Payment Term Western Union, T/T, L/C
  • Wll 12300lbs ~ 373000lbs
  • Treatment Quenched and Tempered
  • Lead Time 10-15 Work Days
  • Sample Available
  • Application Lifting Fittings

Product Description

A345 G80 Master Link Assembly for Chain Slings * Manufactured from G80 alloy steel - Quenched and Tempered * 6-18MM: all welded; 20-32MM: Upper-terminal link by forged, intermediate by welded. * Suitable for G80 lifting chains. * Individually proof test at 2.5 times Working Load Limit. * ...

Learn More

Master Link Assembly Comparison
Transaction Info
Price US $ 0.55-6.99/ Piece US $ 0.001/ Piece US $ 0.001/ Piece US $ 0.001/ Piece US $ 0.001/ Piece
Min Order 100 Pieces 1500000 Pieces 1500000 Pieces 1500000 Pieces 1500000 Pieces
Trade Terms - FOB FOB FOB FOB
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram, cash L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification - RoHS RoHS RoHS RoHS
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets South America, Southeast Asia/ Mideast, Australia Europe, Southeast Asia/ Mideast Europe, Southeast Asia/ Mideast Europe, Southeast Asia/ Mideast Europe, Southeast Asia/ Mideast
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Surface Treatment: Zinc Plated,Powder Coated;
Color: Red ,Yellow ,Blue;
Material: Carbon Steel;
Size: 3/4"~3";
Product Name: Master Link Assembly;
Trade Term: Fob, CFR, CIF;
Process: Drop Forged;
Use: Lifting, Lifting Point, Lashing;
Inspection: Mill Test Certificate Can Be Provided;
Payment Term: Western Union, T/T, L/C;
Wll: 12300lbs ~ 373000lbs;
Treatment: Quenched and Tempered;
Lead Time: 10-15 Work Days;
Sample: Available;
Application: Lifting Fittings;
Material: Steel and Iron;
Connection: Combining with The Screws;
Apply: Pipe and Joint Racking System / Pipe Cnnection;
Material: SPCC;
Connection: Combining with The Screws;
Apply: Pipe and Joint Racking System / Pipe Cnnection;
Craft: Stamping Products;
Material: SPCC;
Connection: Combining with The Screws;
Apply: Pipe and Joint Racking System;
Material: Steel and Plastic;
Connection: Combining with The Screws;
Apply: Pipe and Joint Racking System / Pipe Cnnection;
Supplier Name

Weifang First Rigging Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Rell Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rell Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rell Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rell Co., Ltd.

China Supplier - Gold Member Audited Supplier