Specification |
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Potato;
Product Name: Potato Starch Machine;
Process: Potato Starch Processing;
Final Product: Potato Starch;
Equipment Included: Rasping Mill, Centrifugal Sieve, Hydro Cyclone;
Workers Qty: 8-10 Workers Per Shift;
Installation Time: 3-6 Months;
Capacity: 30-300tpd Output;
Construction Area: 2000-10000m2;
Equipment Name: Potato Starch Machine;
Key Equipment: Rotary Drum Vacuum Filter, Flash Dryer;
|
After-sales Service: Yes;
Warranty: One Year After Commissioning;
Processing Material: Animal Raw Materials, Agronomic Products, Natural Ingredients;
Application: Pet Food, Dairy, Fluid Food;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Name: Tomato Sauce Production Line;
Raw Material: Tomato Paste;
Final Product: Tomato Sauce / Tomato Ketchup;
Final Product 2: Tomato Puree and Jam/ Tomato Juice;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
|