China Factory Boiler Fin Tube for Power Plant

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$2,000.00-3,000.00 / Ton

Sepcifications

  • Certification CE, ISO
  • Customized Customized
  • Surface Treatment Painted
  • Range of Applications Industrial
  • Type Fin Tube
  • Transport Package Frame Packing
  • Trademark SAT-CHAM
  • Origin Suzhou, China
  • Application Boiler System
  • Metrial SUS/Alloy/Carbon
  • Delivery 30 Days
  • Warranty 1 Year

Product Description

Product Description Boiler H-fin tube heat exchanger elements maintain a high capacity for heat transfer, possess superior self-cleaning properties and retain the ability to effect flue gas waste heat recovery in boiler renovations. Convective heat transfer coefficient is proportional to fin ...

Learn More

ASME Comparison
Transaction Info
Price US $ 2,000.00-3,000.00/ Ton US $ 310/ Piece US $ 1,000.00-250,000.00/ Set US $ 4.50-5.00/ Piece US $ 4.50-5.00/ Piece
Min Order 1 Tons 1 Pieces 1 Sets 500 Pieces 500 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T T/T L/C, T/T T/T, Paypal, Alipay T/T, Paypal, Alipay
Quality Control
Product Certification CE, ISO CE, ISO GB Standard CE, ISO CE, ISO
Management System Certification ISO 9001 ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, ISO 14064 ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, HSE, ASME ISO 9001, ANSI/ESD ISO 9001, ANSI/ESD
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM OEM, ODM, Own Brand ODM ODM
Average Lead Time - Off-season: 1-3 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Customized: Customized;
Surface Treatment: Painted;
Range of Applications: Industrial;
Type: Fin Tube;
Application: Boiler System;
Metrial: SUS/Alloy/Carbon;
Delivery: 30 Days;
Warranty: 1 Year;
Customized: Customized;
Surface Treatment: Painted;
Fuel: Gas;
Range of Applications: Industrial;
Structure: Horizontal Type;
After-Sales Service: Online Support, Field Installation;
Warranty: 1 Years;
Customized: Customized;
Surface Treatment: Painted;
Range of Applications: Power station, Steel Works;
Plate Material: 304 316L Al-6xn Hastelloy C-276 254smo,etc;
Cetificate: ISO9001/14000 OHSAS18001;
Warranty Period: One Year;
After Service: Life-Long Maintenance;
Design Standard: ASME/Nb/T47004;
Lead Time: 60 Days;
Application Field: Coking, Metallurgy;
Working Temperature: 200-600 C;
Customized: Customized;
Range of Applications: Power station, Life, Industrial;
Feature: Eco-Friendly;
Material: Metal(Brass/Stainless Steel);
Flame Hoods: Two;
Theromocouple: Customized;
Electrode: Customized;
Orifice: 0.15-2.0mm;
Customized: Customized;
Range of Applications: Power station, Life, Industrial;
Feature: Eco-Friendly;
Material: Metal(Brass/Stainless Steel);
Flame Hoods: Two;
Theromocouple: Customized;
Electrode: Customized;
Orifice: 0.15-2.0mm;
Supplier Name

Jiangsu Satcham Energy Technology Co., Ltd

China Supplier - Gold Member

Henan Xuye Machinery Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shandong Wintech Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Jinan Sinopts Energy Technology Inc.

China Supplier - Diamond Member Audited Supplier

Jinan Sinopts Energy Technology Inc.

China Supplier - Diamond Member Audited Supplier