Specification |
Standard: JIS, ASTM, GB;
Technics: Hot Rolled;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Alloy;
Special Use: High-strength Steel Plate, Cofferdams, Retaining Walls;
Width: 400/500/600/700mm;
Height: 100/125/150/170/210mm;
Length: 6/9/12/15/18m;
Grade: Sy295/Sy390/S355gp/S420gp;
Section Shape: U;
Usage: Retaining Walls, Cofferdams, River Banks;
OEM: Yes;
MOQ: 5 Tons;
Further Processing: Cutting,Punching,Painting,Labelling;
Delivery Period: 5 Workdays;
Trade Term: Fob CIF CFR EXW;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|