Specification |
Type: Copper Busbar;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Copper Busbar;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Cu (Min): 99%;
Price Term: Fob CIF;
MOQ: 1 Kg;
Payment Term: L/C T/T (30%Deposit);
Feature: High Conductivity;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C2680,C26800,H65;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill, Polished, Brushed, etc;
Manufacturing Process: Hot Rolled, Cold Rolled, Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Customized;
Alloy: Alloy;
Color: Red;
Standard: Customized;
Thickness: 0.05-3.1mm;
Status: Y,Y2,M,TM;
Width: 1-600mm;
Ratio of Copper Layer: 4-10%Each Side;
Tolerance: 10%;
|
Type: Copper Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass/Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red/Yellow;
Standard: GB/T;
Length: Can Be Customized;
Mill Test Certificate: Can Supply;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Hot Sale Country: Middle East ,Southeast Asia, South America ,Europe;
Surface: Bright;
Sample: Yes.;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C2680,C26800,H65;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill, Polished, Brushed, etc;
Manufacturing Process: Hot Rolled, Cold Rolled, Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|