Fiber Glass
US$9.00-10.00 / Piece
View
  • Recommend for you
  • What is FRP Pultruded Angle Steel Fiberglass Structural L Channel
  • What is Fiberglass Molds Mold Fiberglass Gfrp Products
  • What is Fiber Glass Product Price China Factory Sale Toilet Parts

What is Train Railway FRP Products GRP Parts FRP

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Pieces US$10.00

100+ Pieces US$9.00

Sepcifications

  • Customized Customized
  • Certification ISO9001
  • Transport Package Wooden Box
  • Trademark SEIT
  • Origin China

Product Description

Product Description Hand lay-up process Glass Fiber Train parts! Applying a resin mixture containing a curing agent to the mold, and then laying a layer of the fiber fabric cut as required, pressing the fabric with a brush, a pressure roller or a doctor blade to uniformly dipping the rubber and ...

Learn More

Fiber Glass Comparison
Transaction Info
Price US $ 9.00-10.00/ Piece US $ 15.00-35.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 2,000.00-2,500.00/ Piece
Min Order 1 Pieces 5000 Pieces 5 Pieces 5 Pieces 5 Pieces
Trade Terms - - - - -
Payment Terms T/T, Paypal L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ISO9001 ISO14001, ISO9001, Uic/Tb/Iris/Crcc ISO14001, ISO/TS16949 ISO14001, ISO/TS16949 ISO14001, ISO9001, Uic/Tb/Iris/Crcc
Management System Certification ISO 9000 ISO 9001, ISO 9000, IATF16949, ASME ISO 9001, ISO 9000, IATF16949, ASME ISO 9001, ISO 9000, IATF16949, ASME ISO 9001, ISO 9000, IATF16949, ASME
Trade Capacity
Export Markets - North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Customized: Customized;
Customized: Customized;
Type: Bolster for Bogie;
Material: AAR/Uic;
Weight: 50-2000kg;
Manufacture Method: Casting/Forging;
Surface: Painting;
Customized: Non-Customized;
Type: Vacuum Toilet;
Leakproofness: Isolate Odor;
Customized: Non-Customized;
Leakproofness: Isolate Odor;
After-sales Service: Warranty for Repair and Spare Parts;
Warranty: 12 Months;
Customized: Customized;
Type: Bolster for Bogie;
Material: AAR/Uic;
Weight: 100-2000kg;
Manufacture Method: Casting/Forging;
Surface: Painting;
Supplier Name

Space Evolution Industry Technology Co., Ltd

China Supplier - Gold Member

Suzhou East Railway Co., Ltd.

China Supplier - Gold Member Audited Supplier

Suzhou East Railway Co., Ltd.

China Supplier - Gold Member Audited Supplier

Suzhou East Railway Co., Ltd.

China Supplier - Gold Member Audited Supplier

Suzhou East Railway Co., Ltd.

China Supplier - Gold Member Audited Supplier