Specification |
Technics: Hot Forging;
Standard: IEC;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Application: Overhead Power Line;
Surface Treatment: Hot DIP Galvanized;
|
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Terminal Clamp;
Material: Galvanized Steel;
Color: Silver;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|
Technics: Injection Molding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Link Fittings;
Surface Treatment: Galvanized;
Material: Ductile Iron;
Features: Corrosion Resistant;
ODM OEM: Acceptable;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|