Kr Approved Hydraulic Steering Five Bladed Ship Controllable Pitch Propeller

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$1,000.00-100,000.00 / Set

Sepcifications

  • Material Cu3 or Cu4
  • Blades 5
  • Certification ISO9001:2000
  • Transport Package Meet The International Standard
  • Specification 10000-200000kgs
  • Trademark SJMATEK
  • Origin China
  • Diameter of Hub up to 1320 mm
  • Diameter of Blade up to 4850 mm
  • Number of Blades 3 / 4 / 5
  • Driven Type E-Motor/Diesel Engine/Hydraulic
  • Certificate CCS/BV/Lr/ABS/Rina/Dnv-Gl
  • Lead Time 6-8 Months

Product Description

Description The controllable pitch propeller (CPP) can be efficient for the full range of rotational speeds and load conditions, since its pitch will be varied to absorb the maximum power that the engine is capable of producing. When fully loaded, a vessel obviously needs more propulsion power than ...

Learn More

Main Controllable Pitch Propeller Comparison
Transaction Info
Price US $ 1,000.00-100,000.00/ Set US $ 1,000.00-200,000.00/ Set US $ 1,000.00-200,000.00/ Set US $ 1,000.00-200,000.00/ Set US $ 30,000.00-8,000,000.00/ Piece
Min Order 1 Sets 1 Sets 1 Sets 1 Sets 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Money Gram T/T, Western Union T/T, Western Union T/T, Western Union L/C, T/T
Quality Control
Product Certification ISO9001:2000 ISO9001:2000 ISO9001:2000 ISO9001:2000 ISO9001:2000, BV
Management System Certification ISO 9001 - - - -
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, Australia, Domestic Domestic Domestic Domestic Domestic
Annual Export Revenue - - - - -
Business Model Own Brand - - - -
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
-
Product Attributes
Specification
Material: Cu3 or Cu4;
Blades: 5;
Diameter of Hub: up to 1320 mm;
Diameter of Blade: up to 4850 mm;
Number of Blades: 3 / 4 / 5;
Driven Type: E-Motor/Diesel Engine/Hydraulic;
Certificate: CCS/BV/Lr/ABS/Rina/Dnv-Gl;
Lead Time: 6-8 Months;
After-sales Service: Online Service;
Warranty: 1year;
Material: Cu3 or Cu4;
Blades: 4;
Model No.: Bt-018;
Certificate: CCS / ABS / BV / Lr / Dnv-Gl;
Lead Time: 1 to 3 Months;
Installation Type: Bow or Stern;
After-sales Service: Online Service;
Warranty: 1year;
Material: Cu3 or Cu4;
Blades: 4;
Model No.: Bt-019;
Certificate: CCS / ABS / BV / Lr / Dnv-Gl;
Lead Time: 1 to 3 Months;
Installation Type: Bow or Stern;
After-sales Service: Online Service;
Warranty: 1year;
Material: Cu3 or Cu4;
Blades: 4;
Model No.: Bt-021;
Certificate: CCS / ABS / BV / Lr / Dnv-Gl;
Lead Time: 1 to 3 Months;
Installation Type: Bow or Stern;
After-sales Service: 1 Years Warranty;
Warranty: 1 Years After Debugging;
Material: Cu3 or SS316;
Blades: 3,4,5 or 7;
Supplier Name

SJMATEK (Suzhou) Marine Machine Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Wealida Marine Power System (Suzhou) Co., Ltd.

China Supplier - Gold Member Audited Supplier

Wealida Marine Power System (Suzhou) Co., Ltd.

China Supplier - Gold Member Audited Supplier

Wealida Marine Power System (Suzhou) Co., Ltd.

China Supplier - Gold Member Audited Supplier

Dutch Thrustleader Marine Propulsion(Jiangsu)Co.Ltd.

China Supplier - Diamond Member Audited Supplier