Specification |
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Copper Pancake Coil Capillary Tube;
Shape: Coil;
Alloy: Alloy;
Color: Golden;
Standard: ASTM;
Length: ≥3000mm, (Straight Pipe));
Minimum Copper Conten: 99.90%;
Strength of Extension(≥ MPa): 205;
Elongation(≥ %): 40%;
Wall Thickness: 0.2mm~1.0mm;
External Diameter: 1.0-5.0mm;
Grade: T1 T2 C11000 C10200 C12000 C12200;
Temper: Soft;
Outside Diameter: O.D3.18-28mm;
Ultimate Strength (≥ MPa): 205;
|
Type: Bronze Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Bronze;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C2680,C26800,H65;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Type: Coil/Reel;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe, Cartridge;
Material: Brass;
Shape: Coil;
Alloy: Alloy;
Color: Golden;
Standard: Customized;
Base Metal: If, Ss, Al, Ti, F11, F18;
Cladding Metal: T2, H65, Ss, H90;
Thickness: 0.15~3.0mm;
Hv Hardness: Hv 90~150;
Elongation: >=10%~40;
|
Type: Coil/Reel;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe, Cartridge;
Material: Brass;
Shape: Coil;
Alloy: Alloy;
Color: Golden;
Standard: Customized;
Base Metal: If, Ss, Al, Ti, F11, F18;
Cladding Metal: T2, H65, Ss, H90;
Thickness: 0.15~3.0mm;
Hv Hardness: Hv 90~150;
Elongation: >=10%~40;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C2680,C26800,H65;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|