Injection Moulding
US$3,300.00-6,000.00 / Piece
View
  • Recommend for you
  • What is Plastic Air Release Valve Mold Male Thread Vacuum Relief Valves Injection Mould
  • What is Agriculture Irrigation Plastic Venturi Injection Mould Lawn Irrigation PVC Valve Mold
  • What is Baby TPE Building Blocks Toy Mold Plastic Children Mega Bloks Injection Mould

What is Heavy Duty Rebar Reinforcing Chairs Mold Building Foundation Footers H-Chair Injection Mould

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$3,300.00-6,000.00 / Piece

Sepcifications

  • Warranty 3 Years
  • Shaping Mode Injection Mould
  • Surface Finish Process Heat Treatment
  • Mould Cavity Multi Cavity
  • Plastic Material HDPE
  • Process Combination Type Compound Die
  • Application Industry
  • Runner Cold Runner
  • Design Software UG
  • Installation Fixed
  • Standard HASCO
  • Customized Customized
  • After-sales Service Lifelong
  • Transport Package Wooden Box
  • Specification 30*30*30mm
  • Trademark SWY MOULD
  • Origin Taizhou Huangyan
  • Mould Steel Anti-Erosion 2316
  • Mould Gate Central Runner Gate
  • Lead Time 45 Days
  • Demould Type Automatic Drop

Product Description

Mould Name Heavy Duty Rebar Reinforcing Chairs Mold Building Foundation Footers H-Chair Injection Mould Mould Specifications Part Size 30*30*30mm Part Resin HDPE Mould Steel Anti-erosion 2316, with heat treatment Steel Treatment Vacuum hardening Mould Cavity 8 Mould Gate Central ...

Learn More

Injection Moulding Comparison
Transaction Info
Price US $ 3,300.00-6,000.00/ Piece US $ 2,000.00-10,000.00/ Piece US $ 2,000.00-10,000.00/ Piece US $ 2,000.00-10,000.00/ Piece US $ 2,000.00-10,000.00/ Piece
Min Order 1 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms T/T T/T, Paypal T/T, Paypal T/T, Paypal T/T, Paypal
Quality Control
Product Certification - ISO ISO ISO ISO
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe South America South America South America South America
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM OEM OEM OEM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Warranty: 3 Years;
Shaping Mode: Injection Mould;
Surface Finish Process: Heat Treatment;
Mould Cavity: Multi Cavity;
Plastic Material: HDPE;
Process Combination Type: Compound Die;
Application: Industry;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: HASCO;
Customized: Customized;
After-sales Service: Lifelong;
Mould Steel: Anti-Erosion 2316;
Mould Gate: Central Runner Gate;
Lead Time: 45 Days;
Demould Type: Automatic Drop;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Multi Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: Pro-E;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Injection Mould for Car Spare Parts;
Mould Life: 300K-500K Shots;
Mould Material: S136/Nak80/P20/738h,etc;
Process: Injection Moulding;
Finish: Pitting The Word, Mirror Finish, Matte Surface;
Package: Wooden Case Package;
Hot Runner: Moldmaster, Incoe, Yudo, Heitec, Gunther, etc;
Mold Type: Insert Mold, Over Mold, Shuttle Mold;
Lead Time to T1 Sample: 4~5 Weeks;
Lead-Time for Production: 1~2 Weeks;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Multi Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: Pro-E;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Product Name: S136 Inject Mold;
Mould Life: 300,000-1,000,000 Cycles;
Mould Material: S136/Nak80/P20/738h/738,etc;
Process: Injection Molding;
Finish: Pitting The Word, Mirror Finish, Matte Surface;
Hot Runner: Moldmaster, Incoe, Yudo, Heitec, Gunther, etc;
Mold Type: Insert Mold, Over Mold, Shuttle Mold;
Lead Time to T1 Sample: 4~5 Weeks;
Lead-Time for Production: 1~2 Weeks;
Package: Wooden Case Package;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Multi Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: Pro-E;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Product Name: Plastic Injection Mold for Car;
Mould Life: 300K-500K Cycles;
Mould Material: S136/Nak80/P20/738h,etc;
Process: Injection Moulding;
Finish: Pitting The Word, Mirror Finish, Matte Surface;
Package: Wooden Case Package;
Hot Runner: Moldmaster, Incoe, Yudo, Heitec, Gunther, etc;
Mold Type: Insert Mold, Over Mold, Shuttle Mold;
Lead Time to T1 Sample: 4~5 Weeks;
Lead-Time for Production: 1~2 Weeks;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: Pro-E;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Injection Mold;
Mould Life: 300K-500K Cycles;
Mould Material: S136/Nak80/P20/738h,etc;
Process: Injection Molding;
Finish: Pitting The Word, Mirror Finish, Matte Surface;
Package: Wooden Case Package;
Hot Runner: Moldmaster, Incoe, Yudo, Heitec, Gunther, etc;
Mold Type: Insert Mold, Over Mold, Shuttle Mold;
Lead Time to T1 Sample: 4~5 Weeks;
Lead-Time for Production: 1~2 Weeks;
Supplier Name

Taizhou Saiweiyue Mould & Plastic Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

China Supplier - Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

China Supplier - Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

China Supplier - Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

China Supplier - Diamond Member Audited Supplier