A106 Carbon Steel Tube Pipe
US$920.00-950.00 / Ton
View
  • Recommend for you
  • What is 304/304L/316316L/347/32750/32760/904L A312 A269 A790 A789 Stainless Steel Pipe Welded Pipe Seamless Pipe Stainless Steel Pipe Manufacturers
  • What is ASTM A333/A333m/ASME SA-333/SA-333m Seamless Steel Pipe for Low-Temperature Use for High-Pressure Fertilizers
  • What is ASTM A554 201 304 304L 316L Corrosion Resistant Round Polished Seamless/API 5L A106 A53 Carbon /Galvanized /Round/ Steel Pipe Prices

What is API 5L/ASTM A106 Gr. B Steel Pipe Heavy Wall Carbon Seamless Steel Pipe and Tube

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

5-99 Tons US$950.00

100+ Tons US$920.00

Sepcifications

  • After-sales Service Negotiate According to Specific Products
  • Warranty Negotiate According to Specific Products
  • Type Welded
  • Technique Hot Rolled
  • Material Carbon Steel
  • Surface Treatment Black
  • Usage Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Construction & Decoration, Special Purpose
  • Section Shape Round
  • Transport Package Standard Export Seaworthy Package,or as Required.
  • Specification As Your Requirement
  • Trademark Kaishuo Weiye
  • Origin Tianjin, China
  • Product Name Carbon Steel Seamless Pipe
  • Length as Requested
  • Outer Diameter as Requested
  • Wall Thickness as Requested
  • Tolerance +/-1%
  • Ends Plain or Beveled
  • Oil or Not as Requested
  • Surface as Requested
  • Technical Methods Hot-Rolled/Cold-Drawn/Hot-Expanded
  • Application Hardware Kitchenware, Shipbuilding, Petrochemical,
  • Quality High Quality.Mtc Inspection
  • MOQ 5 Tons
  • Payment Term Tt30% in Advance+70%Balance Before Shipment
  • Lead Time It Is Normal 7-10 Days After Receive Your Deposit

Product Description

API 5L / ASTM A106 / A53 Grad B carbon Seamless steel pipe Carbon steel pipes are made of steel ingots or solid round steels through perforation into capillary tubes, which are then hot-rolled, cold-rolled or cold-drawn. Carbon steel pipe plays an important role in my country's steel pipe ...

Learn More

A106 Carbon Steel Tube Pipe Comparison
Transaction Info
Price US $ 920.00-950.00/ Ton US $ 490.00-690.00/ Ton US $ 499.00-549.00/ Ton US $ 1,000.00-2,000.00/ Ton US $ 600/ Ton
Min Order 5 Tons 1 Tons 1 Tons 1 Tons 1 Tons
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal T/T
Quality Control
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, GMP, BSCI, BRC, SA 8000, QHSE, HACCP, BS 25999-2, ISO 13485, EICC, ANSI/ESD, SEDEX, ISO 22000, AIB, WRAP, GAP, ASME, ISO 29001, BREEAM, HQE, SHE Audits, IFS, QSR, ISO 50001, LEED, PAS 28000, FSC, ISO 10012, ISO 17025 ISO 9001 ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, GMP, BSCI ISO 9001, GMP ISO 9001, ISO 9000, ISO 10012
Trade Capacity
Export Markets South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia - North America, South America, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - US $1 Million - US $2.5 Million
Business Model OEM, ODM - OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
- - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Negotiate According to Specific Products;
Warranty: Negotiate According to Specific Products;
Type: Welded;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Construction & Decoration, Special Purpose;
Section Shape: Round;
Product Name: Carbon Steel Seamless Pipe;
Length: as Requested;
Outer Diameter: as Requested;
Wall Thickness: as Requested;
Tolerance: +/-1%;
Ends: Plain or Beveled;
Oil or Not: as Requested;
Surface: as Requested;
Technical Methods: Hot-Rolled/Cold-Drawn/Hot-Expanded;
Application: Hardware Kitchenware, Shipbuilding, Petrochemical,;
Quality: High Quality.Mtc Inspection;
MOQ: 5 Tons;
Payment Term: Tt30% in Advance+70%Balance Before Shipment;
Lead Time: It Is Normal 7-10 Days After Receive Your Deposit;
After-sales Service: 24-Hour Customer Service Response;
Warranty: 1 Years;
Type: Welded;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Galvanized;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Square;
Product Name: Galvanized Square Pipe;
Length: 6m or Customized;
Grade: Q235 Q195 Q345 etc.;
Wall Thickness: 1.2-2mm or Customized;
Surface Process: Hot Dipped Galvanized;
MOQ: 1 Ton;
Sample: Provide;
Price Terms: Fob CIF etc.;
Delivery Time: 7-15 Days;
Tolerance: 5%;
Section: Square or Rectangular;
Surface: Painted , Galvanized , Chrome Coated;
Advantage: High Quality and Low Price;
Outer Dimension: 26.9- 310mm;
Application: Structure Pipe;
Type: Welded;
Technique: ERW;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose, 1;
Section Shape: Round;
After-sales Service: 24 Hours with 7 Days Per Week;
Warranty: 12 Months;
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Hydraulic/Automobile Pipe, Machinery Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Delivery Time: 25 Days;
Bore Treatment: Honing or Skiving&Roller Burnishing;
ID Tolerance: H8;
Bore Roughness: Within Ra 0.4;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Length: 3-13m;
Delivery Time: 10 Days;
Grade: 1045 1020 St52 4140 4130 Gr15;
Price Valdity: 7 Days;
Supplier Name

Tianjin Kaishuo Weiye Steel Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Naxin Heavy Industry Group Co., Ltd

China Supplier - Diamond Member Audited Supplier

Shandong Baowu Steel Group Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Wuxi Hanhai Hydraulic Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Liaocheng Jiadonghe Steel Co., Ltd.

China Supplier - Diamond Member Audited Supplier