Crushing Machine Shredder Blades Cutting Tool

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$30.00-99.00 / Piece

Sepcifications

  • Application Machinery Parts
  • Machining M/C Machining
  • Material High Chrome
  • Surface Treatment Polishing
  • Design 3D
  • Casting Tolerance +/-0.5mm
  • Material Inspection Report Material Inspection Report
  • Dimension Report Dimension Report
  • Standard DIN
  • Certification ISO 9001:2000
  • Transport Package Steel Pack
  • Specification 15kg
  • Trademark LXS
  • Origin China
  • Process Lost Foam
  • Drawing Own Design
  • Installation Installation Test
  • Capacity >40 Tons Per Day

Product Description

Product Description Product Parameters Installation Sample: Material requirement: Manufacture Process: Company Introduction: Company Profile Company located in Jinghai District, Tianjin. It was founded on October,1995. From the beginning of its establishment, LXS has ...

Learn More

Blade Comparison
Transaction Info
Price US $ 30.00-99.00/ Piece US $ 4.00-4.50/ Piece US $ 4.00-4.50/ Piece US $ 4.00-4.50/ Piece US $ 4.00-4.50/ Piece
Min Order 10 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal
Quality Control
Product Certification ISO 9001:2000 RoHS, ISO 9001:2008, IATF16949:2016 RoHS, ISO 9001:2008, IATF16949:2016 RoHS, ISO 9001:2008, IATF16949:2016 RoHS, ISO 9001:2008, IATF16949:2016
Management System Certification ISO 14001, HSE ISO 9001, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, IATF16949 ISO 9001, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, IATF16949 ISO 9001, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, IATF16949 ISO 9001, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, IATF16949
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM Others Others Others Others
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Application: Machinery Parts;
Machining: M/C Machining;
Material: High Chrome;
Surface Treatment: Polishing;
Design: 3D;
Casting Tolerance: +/-0.5mm;
Material Inspection Report: Material Inspection Report;
Dimension Report: Dimension Report;
Standard: DIN;
Process: Lost Foam;
Drawing: Own Design;
Installation: Installation Test;
Capacity: >40 Tons Per Day;
Application: Auto Part, Machinery Accessories, Electronic Part;
Machining: CNC Machining/Lathing/Milling/Turning/Boring;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Design: 3D;
Casting Tolerance: CT5-7 for Aluminum Casting;
Material Inspection Report: Material Inspection Report;
Dimension Report: Dimension Report;
Standard: ASTM;
Service: Metal Parts Solution as Customer's Drawing/Design;
Item Name: Customer Machinery/Parts Aluminum Die Casting;
Manufacturing Proceess: Die Casting, Gravity Casting, Lower Pressure Cast;
Rough Surface Roughness: Ra0.4-3.2 for Aluminum Casting After Machining/Gri;
Lead Time: 50 Days for Aluminum Castings/35-40 Days for Tooli;
Transport Packaging: Multiplayer Wood Box/Pallet;
Ppap Level: 3;
Process Control Docs: Spc/Msa/Cpk/I-Mr Study;
Psw: Yes;
Application: Auto Part, Machinery Accessories, Electronic Part;
Machining: CNC Machining/Lathing/Milling/Turning/Boring;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Design: 3D;
Casting Tolerance: CT5-7 for Aluminum Casting;
Material Inspection Report: Material Inspection Report;
Dimension Report: Dimension Report;
Standard: ASTM;
Service: Metal Parts Solution as Customer's Drawing/Design;
Item Name: Customer Machinery/Parts Aluminum Die Casting;
Manufacturing Proceess: Die Casting, Gravity Casting, Lower Pressure Cast;
Rough Surface Roughness: Ra0.4-3.2 for Aluminum Casting After Machining/Gri;
Lead Time: 50 Days for Aluminum Castings/35-40 Days for Tooli;
Transport Packaging: Multiplayer Wood Box/Pallet;
Ppap Level: 3;
Process Control Docs: Spc/Msa/Cpk/I-Mr Study;
Psw: Yes;
Application: Auto Part, Machinery Accessories, Electronic Part;
Machining: CNC Machining/Lathing/Milling/Turning/Boring;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Design: 3D;
Casting Tolerance: CT5-7 for Aluminum Casting;
Material Inspection Report: Material Inspection Report;
Dimension Report: Dimension Report;
Standard: ASTM;
Service: Metal Parts Solution as Customer's Drawing/Design;
Item Name: Customer Machinery/Parts Aluminum Die Casting;
Manufacturing Proceess: Die Casting, Gravity Casting, Lower Pressure Cast;
Rough Surface Roughness: Ra0.4-3.2 for Aluminum Casting After Machining/Gri;
Lead Time: 50 Days for Aluminum Castings/35-40 Days for Tooli;
Transport Packaging: Multiplayer Wood Box/Pallet;
Ppap Level: 3;
Process Control Docs: Spc/Msa/Cpk/I-Mr Study;
Psw: Yes;
Application: Auto Part, Machinery Accessories, Electronic Part;
Machining: CNC Machining/Lathing/Milling/Turning/Boring;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Design: 3D;
Casting Tolerance: CT5-7 for Aluminum Casting;
Material Inspection Report: Material Inspection Report;
Dimension Report: Dimension Report;
Standard: ASTM;
Service: Metal Parts Solution as Customer's Drawing/Design;
Item Name: Customer Machinery/Parts Aluminum Die Casting;
Manufacturing Proceess: Die Casting, Gravity Casting, Lower Pressure Cast;
Rough Surface Roughness: Ra0.4-3.2 for Aluminum Casting After Machining/Gri;
Lead Time: 50 Days for Aluminum Castings/35-40 Days for Tooli;
Transport Packaging: Multiplayer Wood Box/Pallet;
Ppap Level: 3;
Process Control Docs: Spc/Msa/Cpk/I-Mr Study;
Psw: Yes;
Supplier Name

Tianjin Zhong Sheng New Material Technology Co., Ltd

China Supplier - Gold Member Audited Supplier

Weifang Ketuohong Machinery Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Ketuohong Machinery Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Ketuohong Machinery Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Ketuohong Machinery Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier