High Quality JIS Scaffolding Couplers Fixed Clamp Swivel Clamp Sleeve Coupler

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1000 Pieces US$0.80-2.60 / Piece

Sepcifications

  • Material Steel
  • Type Pressed, Drop Forged
  • Scaffolding Part Type Scaffolding Couplers
  • Construction Properties Building Scaffold
  • Transport Package Packing in Woven Bags or Carton
  • Specification 48.3mm, 48.6mm
  • Origin China
  • Surface Electro-Galvanized, HDG

Product Description

Product Specification Product Name Standard Type Craft Type Outer Diameter U.W/kg Double Coupler British(BS) Drop Forged 48.3mm 1 Swivel Coupler British(BS) Drop Forged 48.3mm 1.1 Putlog Coupler British(BS) Drop Forged 48.3mm 0.65 Girder Coupler British(BS) Drop Forged ...

Learn More

Scaffolding Clamp Comparison
Transaction Info
Price US $ 0.80-2.60/ Piece US $ 6.00-19.60/ Piece US $ 6.00-19.60/ Piece US $ 6.00-19.60/ Piece US $ 500.00-800.00/ Ton
Min Order 1000 Pieces 500 Pieces 500 Pieces 500 Pieces 1 Tons
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T
Quality Control
Product Certification - - - - ISO 9001:2008
Management System Certification ISO 9001, ISO 14001, ISO 14064 ISO 9001, ISO 14001, ISO 14064 ISO 9001, ISO 14001, ISO 14064 ISO 9001, ISO 14001, ISO 14064 ISO 9001, ISO 14001, ISO 14064
Trade Capacity
Export Markets South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia
Annual Export Revenue - - - - -
Business Model OEM OEM OEM OEM OEM
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Pressed, Drop Forged;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Surface: Electro-Galvanized, HDG;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Keywords: Steel Plank;
Thickness: 1.0~2.0mm;
Surface 1: Pre-Galvanized;
Surface 2: Hot DIP Galvanized(HDG);
Surface 3: Powder Coated;
Surface 4: Color Painted;
Welding Technique: CO2 Arc Welding;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Keywords: Steel Plank;
Thickness: 1.0~2.0mm;
Surface 1: Pre-Galvanized;
Surface 2: Hot DIP Galvanized(HDG);
Surface 3: Powder Coated;
Surface 4: Color Painted;
Welding Technique: CO2 Arc Welding;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Keywords: Steel Plank;
Thickness: 1.0~2.0mm;
Surface 1: Pre-Galvanized;
Surface 2: Hot DIP Galvanized(HDG);
Surface 3: Powder Coated;
Surface 4: Color Painted;
Welding Technique: CO2 Arc Welding;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Delivery Time: 30days After Deposite;
Supplier Name

TIANJIN SHENGTENG INTERNATIONAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

TIANJIN SHENGTENG INTERNATIONAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

TIANJIN SHENGTENG INTERNATIONAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

TIANJIN SHENGTENG INTERNATIONAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

TIANJIN SHENGTENG INTERNATIONAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier