Specification |
After-sales Service: Online;
Warranty: Online;
Shape: Round;
Application: Water Tube, Water Heater, Oil Cooler Pipe;
Alloy: Non-alloy;
Customized: Customized;
Od: 6.35-406mm;
Wt: 0.5-80mm;
Length: 1-6m or as Customer Require;
Use: Water, Heater and Equipment;
|
After-sales Service: Material Test Certificate;
Warranty: 6 Month;
Type: Straight Copper Pipe;
Shape: Round;
Application: Refrigerator, Air Condition, Water Tube, Water Heater, Oil Cooler Pipe;
Alloy: Non-alloy;
Standard: ASTM B88, ASTM B837, ASTM B306, ASTM B883, ASTM B819;
Grade: T2;
State: Semi Hard;
Customized: Customized;
Color: Red;
Elongation: 35% - 40%;
Tensile Strength: 205---245;
Cu: 99.9%;
MOQ: 500kg;
|
After-sales Service: Material Test Certificate;
Warranty: 6 Month;
Type: Straight Copper Pipe;
Shape: Round;
Application: Refrigerator, Air Condition, Water Tube, Water Heater, Oil Cooler Pipe;
Alloy: Non-alloy;
Standard: ASTM B88, ASTM B837, ASTM B306, ASTM B883, ASTM B819;
Grade: T2;
State: Semi Hard;
Customized: Customized;
Color: Red;
Elongation: 35% - 40%;
Tensile Strength: 205---245;
Cu: 99.9%;
MOQ: 500kg;
|
After-sales Service: Material Test Certificate;
Warranty: 1year;
Type: Straight Copper Pipe;
Shape: Round;
Application: Refrigerator, Air Condition, Water Tube, Water Heater, Oil Cooler Pipe;
Alloy: Non-alloy;
Standard: ASTM B88, ASTM B837, ASTM B306, ASTM B883, ASTM B819;
Grade: T2;
State: Semi Hard;
Customized: Customized;
Color: Yellow;
Elongation: 35% - 40%;
Tensile Strength: 205---245;
Cu: 99.9%;
MOQ: 500kg;
|
After-sales Service: Yes;
Warranty: One Year;
Type: Straight Copper Pipe;
Shape: Round;
Application: Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Alloy: Non-alloy;
Standard: ASTM B88, ASTM B837, ASTM B306, ASTM B883, ASTM B819;
Grade: T2;
State: Hard;
Customized: Customized;
Color: Red;
Product Name: Copper Pipe;
Length: 1000-6000mm, 1~12 or as Customer Required, 2-3m;
Elongation (≥ %): 45%;
Cu (Min): 99.9%;
Wall Thickness: 0.2mm~910mm;
Model Number: Customized;
Price Term: CIF CFR Fob Ex-Work;
Payment Term: 100%T/T,or 30% T/T in Advance;
Key Word: Copper Pipe Copper Tube;
Delivery Time: Within 7-10 Days;
MOQ: 1 Tons;
|