Cuplock Scaffolding
US$0.50-35.00 / Piece
View
  • Recommend for you
  • What is Drop Forged Scaffolding Couplers British Style
  • What is Tube and Coupler Scaffolding Steel Ladder Beam
  • What is German Type Durable Drop Forged Scaffolding Double Clamp

What is Galvanized Scaffold Brace for Cuplock System Construction Equipment

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$0.50-35.00 / Piece

Sepcifications

  • Material Steel
  • Type Fixed or Mobile
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Cuplock Scaffolding
  • Construction Properties Installation Scaffold
  • Transport Package Steel Pallet
  • Specification 48.3x2.5mm
  • Trademark Tuopeng Scaffold
  • Origin Jiangsu, China
  • Item Name Cuplock Scaffolding Brace
  • Surface Finish HDG, Painted, Powder Coated
  • Length Various

Product Description

Cuplock scaffolding brace 1. Cuplock scaffolding brace is made of 48.3mm tubes, with the blade assembled. 2. The brace blade is inserted the cups, helping to fix the whole cuplock system scaffolding. 3. Surface finish:hot dip galvanised long lasting from rusted, powder coated or painted ...

Learn More

Cuplock Scaffolding Comparison
Transaction Info
Price US $ 0.50-35.00/ Piece US $ 10.00-15.00/ Piece US $ 21.00-35.00/ Piece US $ 21.00-45.00/ Piece US $ 0.85/ Piece
Min Order 1 Pieces 500 Pieces 1 Pieces 1 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T T/T L/C, T/T, D/P, Western Union, Paypal L/C, T/T
Quality Control
Product Certification - - ISO9001 ISO9001 -
Management System Certification - ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic Southeast Asia/ Mideast, Domestic Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea) Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Others OEM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed or Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Cuplock Scaffolding;
Construction Properties: Installation Scaffold;
Item Name: Cuplock Scaffolding Brace;
Surface Finish: HDG, Painted, Powder Coated;
Length: Various;
Material: Steel;
Type: Fixed/ Mobile;
Structural Style: Doors Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Erection Position: External Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Scaffold;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Usage: Building Material;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Scaffold;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Usage: Building Material;
Material: Steel;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Erection Position: External & Internal Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Surface: Electro-Galvanized, HDG;
Standard: BS1139, En74;
Steel: Q235, Q355;
Processing: Drop Forged, Pressed;
Coupler Type: British/Japanese/Korean/German/America Type Clamp;
Color: Golden, Silver;
Packing: Packing in Woven Bags or Carton;
MOQ: 1000PCS;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Tangshan Wufang Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Wufang Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier