Workthrough Frame Scaffold
US$27.00-40.00 / Piece
View
  • Recommend for you
  • What is Scaffolding Drop Forged Board Retaining Coupler for Tube and Clamp Scaffold
  • What is China Factory Supply High Quality Scaffolding Shoring Frame 6′ X 4′ Hot DIP Galvanized
  • What is Frame Scaffolding Blue Scaffolding Sidewalk Bridge Leg / Sidewalk Shed

How to Make Top Quality blue Workthrough Frame Scaffold for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$27.00-40.00 / Piece

Sepcifications

  • Material Steel
  • Type Mobile
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Installation Scaffold
  • Transport Package in Bags First, Then Pallet
  • Specification 5′ x6′ 4", etc.
  • Trademark Tuopeng Scaffold
  • Origin Jiangsu, China
  • Item 5′X6′4" Frame Scaffold
  • Unit Weight 24kg
  • Surface Finish Powder Coated,HDG
  • Color Blue,Silver,Yellow,etc.

Product Description

Top Quality Bule Workthrough Frame Scaffold for Construction Product Overview 1.Walkthrough scaffolding frame is made of 42.7×2.4mm tubes and 32x2mm tubes ,5'x6'4" or 42"x6'4",36"x6'4" 2.Material:vertical,Q345,horizontal,Q235,or as requested 3.Lock options: snap on lock,drop lock,flip ...

Learn More

Workthrough Frame Scaffold Comparison
Transaction Info
Price US $ 27.00-40.00/ Piece US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece US $ 0.30-3.00/ Piece US $ 5.00-30.00/ Piece
Min Order 1 Pieces 100 Pieces 100 Pieces 1000 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification - En12811 En12811 En74/BS1139/As15 En12811
Management System Certification - ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Others OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Item: 5′X6′4" Frame Scaffold;
Unit Weight: 24kg;
Surface Finish: Powder Coated,HDG;
Color: Blue,Silver,Yellow,etc.;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Surface Treatment: Electro Galvanizing;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier