Scaffolding Clamp for Tube
US$1.25-1.40 / Piece
View
  • Recommend for you
  • What is Ringlock Scaffolding Accessories Steel Black Color Rosette
  • What is Scaffolding Construction Scaffold Twist Lock Tube and Twist Lock Fittings
  • What is Drop Forged Scaffolding Couplers British Style

What is Forged Scaffolding Clamp Double Clamp for Tube

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$1.25-1.40 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Couplers
  • Construction Properties Installation Scaffold
  • Transport Package in Bags First, Then Pallet
  • Specification 48.3mm*48.3mm
  • Trademark Tuopeng Scaffold
  • Origin Jiangsu, China
  • Item Drop Forged Double Coupler
  • Unit Weight 0.97kg
  • Surface Finish HDG, Electro Galvanized
  • Marking Service Available

Product Description

Scaffolding Drop forged double coupler British type: 1. Drop forged double coupler British type, which is widely used in global market to connect 48.3mm tubes at 90 degrees. 2. Unit weight: 0.97kg 3. Surface finish: electro galvanized, or hot dip galvanized 4. Meeting EN74 and BS1139 Standard ...

Learn More

Scaffolding Clamp for Tube Comparison
Transaction Info
Price US $ 1.25-1.40/ Piece US $ 3.00-20.00/ Piece US $ 3.00-20.00/ Piece US $ 1.00-1.40/ Meter US $ 3.00-20.00/ Piece
Min Order 1 Pieces 100 Pieces 100 Pieces 1 Meters 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Western Union L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification - SGS/TUV SGS/TUV - SGS/TUV
Management System Certification - ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, BSCI, ASME ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Southeast Asia/ Mideast, Australia, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Others OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
- Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Installation Scaffold;
Item: Drop Forged Double Coupler;
Unit Weight: 0.97kg;
Surface Finish: HDG, Electro Galvanized;
Marking Service: Available;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hot Dipped Galvanization;
Material: Steel;
Type: Bar;
Structural Style: Fixed Scaffolding;
Framework: Fixed Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Assemble with Accessories;
Erection Position: External Scaffolding;
Move Method: Split Move;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Installation Scaffold;
Surface Treatment: Hot Dipped Galvanization;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

Handan Yidao Metal Products Co., Ltd

China Supplier - Gold Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier