Scaffolding Girder Clamp
US$2.20-3.00 / Piece
View
  • Recommend for you
  • What is Scaffolding Shoring Prop Scaffold Beam Aluminum Beam
  • What is Scaffolding Clamp Fitting Forged Board Retaining Coupler
  • What is Frame Scaffolding Blue Scaffolding Sidewalk Bridge Leg / Sidewalk Shed

What is Scaffolding Swivel Girder Clamp Drop Forged

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$2.20-3.00 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Couplers
  • Construction Properties Installation Scaffold
  • Transport Package in Bags First, Then Pallet
  • Specification 48.3mm
  • Trademark Tuopeng Scaffold
  • Origin Jiangsu, China
  • Item Drop Forged Swivel Girder Coupler
  • Unit Weight 1.6kg
  • Surface Finish HDG, Electro Galvanized

Product Description

Scaffolding swivel girder clamp drop forged 1. Swivel girder coupler is drop forged 2. Unit weight: 1.6kg 3. Surface finish: electro galvanized, or hot dip galvanized 4. Packing: 25pcs per bag, 50bags per pallet 5. Rich experience in producing drop forged couplers and pressed couplers, with ...

Learn More

Scaffolding Girder Clamp Comparison
Transaction Info
Price US $ 2.20-3.00/ Piece US $ 25.00-35.00/ Set US $ 15.00-32.00/ Set US $ 4.80-5.50/ Piece US $ 7.20-11.00/ Piece
Min Order 1 Pieces 10 Sets 15 Sets 500 Pieces 500 Pieces
Trade Terms FOB, CIF - - - -
Payment Terms L/C, T/T T/T, Western Union, Cash T/T, Western Union, Cash T/T, Western Union, Cash T/T, Western Union, Paypal, Cash
Quality Control
Management System Certification - ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Others OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Installation Scaffold;
Item: Drop Forged Swivel Girder Coupler;
Unit Weight: 1.6kg;
Surface Finish: HDG, Electro Galvanized;
After-sales Service: Yes;
Warranty: 1year;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: Internal or External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Color: Customized;
Surface: DIP Painted;
Diameter: 42 mm;
Thickness: 2.0/2.2mm;
Welding: Carbon Dioxide Protection;
Life Span: 3-5 Years;
Usage: Building Construction;
After-sales Service: Yes;
Warranty: 1year;
Material: Steel;
Type: Mobile;
Structural Style: Doors Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface: Powder Coating/Painting/Hot DIP Gavlanized;
Color: Blue, Orange, Silver etc;
Technique: CO2 Arc Welded;
OEM/ODM: Yes;
Tube Thickness: 1.2mm-2.2mm;
Height: 1m;
Load Capacity: 500kgs;
Life Span: 5-8years;
Suface Procedure: Galvanization or Hot DIP Painted;
Combination Height: 6-12m;
After-sales Service: Yes;
Warranty: 1 Year;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Single Row Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Deliver Time: About 20-30 Days After Confirmation;
Working Life: 3-4 Years Normal Condition;
Surface Treatment: High Protected Painted, Powder Coating;
Usage: Building Construction;
MOQ: 500PCS;
Color: Customized;
OEM/ODM: Yes;
After-sales Service: Yes;
Warranty: 1year;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Single Row Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Working Life: 3-4 Years Normal Condition;
Color: Yellow/Red/Green/Blue/etc.;
Delivery Time: About 20-30 Days After Confirmation;
Surface Treatment: High Protected Painted, Powder Coating;
Usage: Construction Formwork;
MOQ: 500PCS;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier