Powder Metallurgy
US$0.50-5.00 / Piece
View
  • Recommend for you
  • What is Factory Customized Powder Metal Sintered Vvt Plates for Automobile Parts
  • What is Garden Machine Lawn Mower Metal Stamping Powder Metallurgy Parts in Set
  • What is Sintered Metal Iron Gear IATF16949

What is Sintered Metal Powder Metallurgy Structural Parts Products

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99,999 Pieces US$5.00

100,000+ Pieces US$0.50

Sepcifications

  • Application Motor, Electric Cars, Motorcycle, Machinery, Marine, Toy, Agricultural Machinery, Car, as Required
  • Hardness as Required
  • Gear Position as Required
  • Manufacturing Method Powder Metallurgy
  • Toothed Portion Shape as Required
  • Material as Required
  • Type as Required
  • Transport Package as Required
  • Specification as Required
  • Trademark as Required
  • Origin Jiangsu
  • Package as Required
  • Process Powder Metallurgy
  • Name as Required
  • Size as Required

Product Description

Excellent powder metallurgy parts metallic sintered parts We could offer various powder metallurgy parts including iron based and copper based with top quality and cheapest price, please only send the drawing or sample to us, we will according to customer's requirement to make it. if you are ...

Learn More

Powder Metallurgy Comparison
Transaction Info
Price US $ 0.50-5.00/ Piece US $ 0.15-0.65/ Piece US $ 0.15-0.65/ Piece US $ 0.15-0.65/ Piece US $ 0.15-0.65/ Piece
Min Order 1 Pieces 500 Pieces 500 Pieces 500 Pieces 500 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification IATF16949 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Application: Motor, Electric Cars, Motorcycle, Machinery, Marine, Toy, Agricultural Machinery, Car, as Required;
Hardness: as Required;
Gear Position: as Required;
Manufacturing Method: Powder Metallurgy;
Toothed Portion Shape: as Required;
Material: as Required;
Type: as Required;
Package: as Required;
Process: Powder Metallurgy;
Name: as Required;
Size: as Required;
Application: Motor, Electric Cars, Motorcycle, Machinery, Car, Others;
Hardness: Hardened Tooth Surface;
Gear Position: Internal Gear;
Manufacturing Method: Plastic Injection;
Toothed Portion Shape: Bevel Wheel;
Material: Plastic;
Type: Bevel Gear;
Prototype Process: SLA, Vacuum Forming, CNC, etc.;
Molding Process: Injection Molding;
Service: OEM/ODM/Obm, Custom Logo / Packaging, 3D Design Dr;
Sample Time: 3-7 Days;
Lead Time: 10-20 Days;
Application: Motor, Electric Cars, Motorcycle, Machinery, Car, Others;
Hardness: Hardened Tooth Surface;
Gear Position: Internal Gear;
Manufacturing Method: Plastic Injection;
Toothed Portion Shape: Bevel Wheel;
Material: Plastic;
Type: Bevel Gear;
Prototype Process: SLA, Vacuum Forming, CNC, etc.;
Molding Process: Injection Molding;
Service: OEM/ODM/Obm, Custom Logo / Packaging, 3D Design Dr;
Sample Time: 3-7 Days;
Lead Time: 10-20 Days;
Application: Motor, Electric Cars, Motorcycle, Machinery, Car, Others;
Hardness: Hardened Tooth Surface;
Gear Position: Internal Gear;
Manufacturing Method: Plastic Injection;
Toothed Portion Shape: Bevel Wheel;
Material: Plastic;
Type: Bevel Gear;
Prototype Process: SLA, Vacuum Forming, CNC, etc.;
Molding Process: Injection Molding;
Service: OEM/ODM/Obm, Custom Logo / Packaging, 3D Design Dr;
Sample Time: 3-7 Days;
Lead Time: 10-20 Days;
Application: Motor, Electric Cars, Motorcycle, Machinery, Car, Others;
Hardness: Hardened Tooth Surface;
Gear Position: Internal Gear;
Manufacturing Method: Plastic Injection;
Toothed Portion Shape: Bevel Wheel;
Material: Plastic;
Type: Bevel Gear;
Prototype Process: SLA, Vacuum Forming, CNC, etc.;
Molding Process: Injection Molding;
Service: OEM/ODM/Obm, Custom Logo / Packaging, 3D Design Dr;
Sample Time: 3-7 Days;
Lead Time: 10-20 Days;
Supplier Name

Taizhou Kecheng Automotive Components and Parts Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xiamen Neway Rubber & Plastic Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xiamen Neway Rubber & Plastic Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xiamen Neway Rubber & Plastic Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xiamen Neway Rubber & Plastic Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier