Formwork Column Waler Clamp Dome Plate Combi Wing Nut

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1000 Pieces US$0.90 / Piece

Sepcifications

  • Material Metal
  • Type Fixed
  • Structural Style Tower Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position Internal Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Couplers
  • Construction Properties Building Scaffold
  • Transport Package Pallet/Boxes
  • Specification EN, CE, BS
  • Trademark wellmade scaffold
  • Origin China
  • Size Casted Iron

Product Description

Combi Nut is a formwork accessory combine formwork wing nut and base plate to use together with 15/17(D16mm) or 19/21(D20mm) Tie Rod in Wall Concrete Formwork, Columns,Shuttering etc. The combi nut is casted iron or drop forged in customized confirm to BS En standard. Company Profile ...

Learn More

Formwork Comparison
Transaction Info
Price US $ 0.9/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece
Min Order 1000 Pieces 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms FOB, CIF - - - -
Payment Terms L/C, T/T L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification - ISO, Ce, SGS ISO, Ce, SGS ISO, Ce, SGS ISO, Ce, SGS
Management System Certification ISO 9001, ISO 9000, ISO 14001, BS 25999-2 ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Metal;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Size: Casted Iron;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Supplier Name

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier