Carbin Steel Hot DIP Galvanized Anchor Assembly

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces Negotiable

Sepcifications

  • Technics Injection Molding
  • Standard ANSI
  • Usage Line Fittings
  • Type Eye Bolt
  • Transport Package Standard Exportation Carton
  • Specification 100 Pieces/ Carton
  • Trademark None
  • Origin China
  • Material Carbin Steel
  • Finish Hot DIP Galvanizition ASTM A153/ASTM A123
  • Installation Manually Installed
  • Application Electric Pole Line/Cable
  • OEM Available

Product Description

Product Description Contoured, forged Thimble Eye Bolts are used for dead-ending and attaching guy wires to utility poles and structures. Two types are available: straight and angled. Straight Thimble Eye Bolts are for lateral guys, and the Angled Thimble Eye Bolts are for down guys. Bolts feature ...

Learn More

Anchor Comparison
Transaction Info
Price Negotiable US $ 22.00-26.00/ Piece US $ 32.00-36.00/ Piece US $ 20.00-25.00/ Piece US $ 10.00-15.00/ Piece
Min Order 100 Pieces 50 Pieces 50 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, GMP, BSCI ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets - Africa, Australia Africa, Australia Africa, Australia Africa, Australia
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - - - - -
Product Attributes
Specification
Technics: Injection Molding;
Standard: ANSI;
Usage: Line Fittings;
Type: Eye Bolt;
Material: Carbin Steel;
Finish: Hot DIP Galvanizition ASTM A153/ASTM A123;
Installation: Manually Installed;
Application: Electric Pole Line/Cable;
OEM: Available;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Supplier Name

Beijing Winner Electric Power Energy Co., Ltd

China Supplier - Diamond Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier