Specification |
Standard: GB, GOST;
Surface Treatment: Spray-Paint;
Manufacturing Process: Forging;
Material: Carbon Steel;
Thread: API 2 3/8" Reg,API 3 1/2" Reg,API 4 1/2" Reg,etc..;
Condition: 100% New;
Color: on Request;
Delivery: 25-30days;
MOQ: 1PCS;
After Sale Service: Yes;
OEM/ODM: Yes;
|
Material: Carbon Steels, Alloy Steels, Stainless Steels, etc;
Name: Steel Mining Machinery Part for Mining Equipment;
Casting Process: Iron Casting, Lost Wax Casting, Investment Casting;
Machining Process: CNC Machining, Milling, Turning;
Tolerance: +/-0.01mm;
Quality Control: 100% Inspected;
Sample Delivery Time: 20-30 Days;
Factory Audit: ISO 9001;
Usage: Mining Machinery Parts;
|
Material: Carbon Steels, Alloy Steels, Stainless Steels, etc;
Name: Compound Hammer Mining Machine Parts;
Casting Process: Iron Casting, Lost Wax Casting, Investment Casting;
Machining Process: CNC Machining, Milling, Turning;
Tolerance: +/-0.01mm;
Quality Control: 100% Inspected;
Sample Delivery Time: 20-30 Days;
Factory Audit: ISO 9001;
Usage: Mining Machinery Parts;
|
Material: Carbon Steels, Alloy Steels, Stainless Steels, etc;
Name: Stainless Steel Special Ring Construction and Mini;
Casting Process: Iron Casting, Lost Wax Casting, Investment Casting;
Machining Process: CNC Machining, Milling, Turning;
Tolerance: +/-0.01mm;
Quality Control: 100% Inspected;
Sample Delivery Time: 20-30 Days;
Factory Audit: ISO 9001;
Usage: Mining Machinery Parts;
|
Manufacturing Process: Casting;
Material: Carbon Steels, Alloy Steels, Stainless Steels, etc;
Name: Cast&Forged Metal Casting Mining Machinery Parts;
Casting Process: Iron Casting, Lost Wax Casting, Investment Casting;
Machining Process: CNC Machining, Milling, Turning;
Tolerance: +/-0.01mm;
Quality Control: 100% Inspected;
Sample Delivery Time: 20-30 Days;
Factory Audit: ISO 9001;
Usage: Mining Machinery Parts;
|