Cable Lugs
US$0.04-0.80 / Piece
View
  • Recommend for you
  • What is Automatic Busbar Terminal Block Machine
  • What is Aluminum Neutral Link Manufacturing Machine
  • How to Use Ye-Z1s Double Head Automatic Plastic Ceramic Tube Chamfering Machine for Small Diameter Metal Workpiece

What is Sc Series Tinned Connector Terminals Copper Cable Lugs

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$0.04-0.80 / Piece

Sepcifications

  • Technics Welding
  • Standard GB
  • Usage Line Fittings, Wire Connector, Power
  • Type Terminal
  • Transport Package Carton
  • Specification 1.5-600sqmm
  • Trademark Yqunique
  • Origin China

Product Description

Product Description Our company specializes in the production of SG copper terminals, JG copper terminals, GT copper terminals. The company is based on good faith, to create the brand. Products with national standard wire and cable, surface tinned, good electrical conductivity. Various ...

Learn More

Cable Lugs Comparison
Transaction Info
Price US $ 0.04-0.80/ Piece US $ 12.00-26.00/ Piece US $ 15.00-28.00/ Piece US $ 18.00-40.00/ Piece US $ 18.00-39.00/ Piece
Min Order 1 Pieces 50 Pieces 50 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Africa, Australia Africa, Australia Africa, Australia Africa, Australia
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
- - - -
Product Attributes
Specification
Technics: Welding;
Standard: GB;
Usage: Line Fittings, Wire Connector, Power;
Type: Terminal;
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Supplier Name

Wenzhou Unique Electric Co., Ltd

China Supplier - Diamond Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier