Cap and Pin Insulator Metals for Polymer Insulator

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Sets US$2.00 / Set

Sepcifications

  • Technics Forging or Casting Steel
  • Standard IEC
  • Usage Line Post Insulator
  • Type Link Fittings
  • Transport Package Export Standard Package or Special Package as The
  • Trademark ZEJIA or OEM
  • Origin Yangzhou City, Jiangsu Province
  • Color Silver
  • Material Ductile Iron
  • Surface Treatment Hot DIP Galvanized
  • Zinc Coat Above 86μm

Product Description

Product Description Polymer pin insulator is suitable for high voltage line facilities. It has good hydrophobicity, ageing resistance, tracking resistance and electrical erosion resistance, also it has high bending resistance, torsion resistance, impulse resistance, Shockproof and brittle ...

Learn More

Insulator Metal Fittings Comparison
Transaction Info
Price US $ 2/ Set US $ 10.00-15.00/ Piece US $ 7.20-7.80/ Piece US $ 7.20-7.80/ Piece US $ 7.20-7.80/ Piece
Min Order 500 Sets 50 Pieces 50 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms T/T, Western Union, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification - ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Europe Africa, Australia Africa, Australia Africa, Australia Africa, Australia
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - - - - -
Product Attributes
Specification
Technics: Forging or Casting Steel;
Standard: IEC;
Usage: Line Post Insulator;
Type: Link Fittings;
Color: Silver;
Material: Ductile Iron;
Surface Treatment: Hot DIP Galvanized;
Zinc Coat: Above 86μm;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Supplier Name

Yangzhou Ze Jia International Trade Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier