Specification |
Surface: Smooth;
Technique: Galvanized;
Application: Rope, Packaging, Netting, Manufacturing, Fencing, Construction, Steel Cable;
Alloy or Not: Non-alloy;
Standard: BS, JIS, GB, ASTM, DIN, AISI;
Samples: Free Samples;
MOQ: 1 Ton;
Material: High Carbon Steel;
|
Surface: Smooth;
Technique: Drawn Wire;
Application: Rope, Packaging, Netting, Manufacturing, Fencing, Construction;
Alloy or Not: Non-alloy;
Standard: BS, JIS, GB, ASTM, DIN, AISI;
Item Name: Hard Drawn Black Carbon Mesh Fence Steel Wire;
Coil Weight: 20-1200kgs;
Usage Equipment: Vehicle, Car, Mattress, Sofa, Screen, Door;
FCL Weight: 20-27 Tons (20'gp);
Delivery Time: Within 7 Days After Receiving Your Deposite or L/C;
Steel: Mattress Spring Coil Steel Wire;
|
Surface: Smooth;
Technique: Drawn Wire;
Application: Rope, Manufacturing, Construction;
Alloy or Not: Alloy;
Standard: JIS, GB;
Function: Construction Materilals;
Weight(Kg/M): 1.4~2.3;
Rated Load Kn: 20~30;
Applicable Cable Diameter: 50~125mm;
Wire Gauge: Customer Demand, 7~42mm;
Diameter (mm): 7~42mm;
Breaking Force (Kn): 34~817kn;
Length: Custermized;
Material: Hot DIP Galvanizing;
Featrue: Low Relaxtion;
Diameter: Customized;
|
Surface: Smooth;
Technique: Drawn Wire;
Application: Rope, Packaging, Netting, Manufacturing, Fencing, Construction;
Alloy or Not: Non-alloy;
Standard: BS, JIS, GB, ASTM, DIN, AISI;
Item Name: High Carbon 2.20 mm Steel Wire for Spring Mattress;
Coil Weight: 20-1200kgs;
Usage Equipment: Vehicle, Car, Mattress, Sofa, Screen, Door;
FCL Weight: 20-27 Tons (20'gp);
Delivery Time: Within 7 Days After Receiving Your Deposite or L/C;
Steel: Mattress Spring Coil Steel Wire;
|
Surface: Smooth;
Technique: Drawn Wire;
Application: Rope, Packaging, Netting, Manufacturing, Fencing, Construction;
Alloy or Not: Non-alloy;
Standard: BS, JIS, GB, ASTM, DIN, AISI;
Delivery Time: 7-10 Days;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Trade Terms: EXW Fob CFR CIF;
Stock or Not: Enough Stock;
Tolerance: ±1%;
Diameter: 0.5-10mm;
Length: Customized;
MOQ: 3 Tons;
Process: Forging+Machining(If Need)+Surface Treatment;
Heat Treatment: Annealed;
Payment Term: Tt LC;
Inspection: ISO, BV, SGS;
|