Home
Product Directory
Industrial Equipment & Components
Heater & Heat Exchanger
Heating Equipment
Heater Unit
Purchase Qty.: (Pieces) |
1-2 3-4 5+ |
---|---|
FOB Unit Price: | US$2,103.4503 US$1,893.1052 US$1,612.6452 |
Purchase Qty. (Pieces) | FOB Unit Price |
---|---|
1-2 | US$2,103.4503 |
3-4 | US$1,893.1052 |
5+ | US$1,612.6452 |
Port: | Tianjin, China |
---|---|
Production Capacity: | 888ton/Year |
Payment Terms: | L/C, T/T, D/P, Western Union, Paypal, Money Gram |
Similar Items
Loading...
You May Like
Loading...
Product Description
Company Info
Address:
East of Panshan Home Plaza, Zhongchang Road, Jizhou District, Tianjin, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Manufacturing & Processing Machinery
Management System Certification:
ISO 9001, ISO 9000, ISO 14000
Company Introduction:
Tianjin Xinhua Energy Equipment Technology Co., Ltd. Was founded in 2006. It is located at the foot of the beautiful Yanshan Mountain--Jixian County, Tianjin, 80 kilometers west of Beijing, and is close to the 102 National Highway and Jinwei Highway, with convenient transportation...Is a high-tech enterprise with production of new heat exchange components-heat pipes.
The company currently has a complete production process, with two heat pipe production lines, two high-frequency welded finned tube production lines, two steel-aluminum composite pipes, and a jet pipe production line. Annual production of various heat transfer components has also been From the original 1 million to 2 million, various energy-saving equipment has also increased from more than 500 tons when the factory was originally built to more than 8, 000 tons.
The company currently has a complete production process, with two heat pipe production lines, two high-frequency welded finned tube production lines, two steel-aluminum composite pipes, and a jet pipe production line. Annual production of various heat transfer components has also been From the original 1 million to 2 million, various energy-saving equipment has also increased from more than 500 tons when the factory was originally built to more than 8, 000 tons.