Carbon Steel Pipe
US$320.00-450.00 / Ton
View
  • Recommend for you
  • What is High Precision and Quality St52, St35, St42, St45 LSAW ERW Ms CS Line Welded Seamless Carbon Steel Pipes
  • What is Good Quality Square Tube Carbon Steel Pipe Black Hollow Section Carbon Steel Q235 Square Metal Tube
  • What is ASTM Q235 A106 A53 Low Carbon Seamless Carbon Steel Tube Pipe for Pipeline Transport

What is Q235 Q235B Q195 Ss400 Carbon Steel Pipes Carbon Steel Tube

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-49 Tons US$450.00

50-99 Tons US$400.00

100+ Tons US$320.00

Sepcifications

  • After-sales Service Support
  • Warranty Support
  • Type Welded
  • Technique Hot Rolled
  • Material Carbon Steel
  • Surface Treatment Black
  • Usage Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
  • Section Shape Round
  • Transport Package Standard Export Packing
  • Specification Carbon Steel Pipes
  • Trademark Carbon Steel Pipes
  • Origin China
  • Name Carbon Steel Pipes
  • Model No. A512 Gr50 A36 St37 S45c St52 Ss400 S355j2 Q345b Q6
  • Applications Mold & Dies, Ship Plate, Boiler Plate, Container P
  • Size as Required
  • Shape Plate
  • MOQ 1 Ton
  • Special Usage Cutting Tools, Measuring Tools, Cutters in Common
  • Thickness 0.1mm-300mm or as Required
  • Processing Service Bending, Welding, Decoiling, Punching, Cutting
  • Sample Provided
  • Techniques Customer′s Requirement
  • Test Report Provide
  • Quality High Quality,Third-Party Quality Inspection
  • Steel Grade Ar500 Q235 Ss400 Q355 S355j2 S275 A36
  • Alloy or Not Non-Alloy

Product Description

Carbon Steel Pipes Product Description ERW(Electric Resistance Welding) ERW welded pipes are divided into ordinary welded steel pipes and low pressure flow welded steel pipes. The latter has an additional hydraulic test, and the price is also about 80 per ton higher than that of ordinary ...

Learn More

Carbon Steel Pipe Comparison
Transaction Info
Price US $ 320.00-450.00/ Ton US $ 400.00-760.00/ Ton US $ 400.00-760.00/ Ton US $ 400.00-760.00/ Ton US $ 400.00-760.00/ Ton
Min Order 1 Tons 5 Tons 5 Tons 5 Tons 5 Tons
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union L/C, T/T, D/P, Western Union L/C, T/T, D/P, Western Union L/C, T/T, D/P, Western Union
Quality Control
Management System Certification ISO 9001, ISO 9000 ISO 9001, ISO 14001, ISO 20000 ISO 9001, ISO 14001, ISO 20000 ISO 9001, ISO 14001, ISO 20000 ISO 9001, ISO 14001, ISO 20000
Trade Capacity
Export Markets Southeast Asia/ Mideast South America, Eastern Europe, Southeast Asia, Africa, Mid East South America, Eastern Europe, Southeast Asia, Africa, Mid East South America, Eastern Europe, Southeast Asia, Africa, Mid East South America, Eastern Europe, Southeast Asia, Africa, Mid East
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM OEM OEM OEM
Average Lead Time - Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Support;
Warranty: Support;
Type: Welded;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Name: Carbon Steel Pipes;
Model No.: A512 Gr50 A36 St37 S45c St52 Ss400 S355j2 Q345b Q6;
Applications: Mold & Dies, Ship Plate, Boiler Plate, Container P;
Size: as Required;
Shape: Plate;
MOQ: 1 Ton;
Special Usage: Cutting Tools, Measuring Tools, Cutters in Common;
Thickness: 0.1mm-300mm or as Required;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Sample: Provided;
Techniques: Customer′s Requirement;
Test Report: Provide;
Quality: High Quality,Third-Party Quality Inspection;
Steel Grade: Ar500 Q235 Ss400 Q355 S355j2 S275 A36;
Alloy or Not: Non-Alloy;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Varnishing;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Model No.: Gr.B, X42,X52,X60,X70,J55, P91, St.52.0,;
Product Name: Seamless Steel Tube/Pipe;
Date Delivery: 5-30days(According to Product);
Product Specification: Chemical Pipe, Piling, Oil , Tailing Pipe, etc;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Varnishing;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Model No.: Gr.B, X42,X52,X60,X70,J55, P91, St.52.0,;
Product Name: Seamless Steel Tube/Pipe;
Date Delivery: 5-30days(According to Product);
Product Specification: Chemical Pipe, Piling, Oil , Tailing Pipe, etc;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Varnishing;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Model No.: Gr.B, X42,X52,X60,X70,J55, P91, St.52.0,;
Product Name: Seamless Steel Tube/Pipe;
Date Delivery: 5-30days(According to Product);
Product Specification: Chemical Pipe, Piling, Oil , Tailing Pipe, etc;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Varnishing;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Model No.: Gr.B, X42,X52,X60,X70,J55, P91, St.52.0,;
Product Name: Seamless Steel Tube/Pipe;
Date Delivery: 5-30days(According to Product);
Product Specification: Chemical Pipe, Piling, Oil , Tailing Pipe, etc;
Supplier Name

Shandong Jiugang Metal Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Chief Steel (Shanghai) Trading Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Chief Steel (Shanghai) Trading Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Chief Steel (Shanghai) Trading Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Chief Steel (Shanghai) Trading Co., Ltd.

China Supplier - Diamond Member Audited Supplier