Frame Walk Through
US$8.00 / Piece
View
  • Recommend for you
  • What is Painted Galvanised Formwork Deck Support Telescopicos Puntales Metalicos Scaffold Shoring Prop Adjustable Props Jack Scaffolding Steel Props
  • What is Scaffolding Material Construction Frame Scaffolding Office Building Warehouse Adto Group
  • What is Easy Scaffolding Au Standard Hot DIP Galvanized Painting Powder Coated Ledger Trasom Diganol Brace Steel Kwikstage Scaffold Painters Scaffold

What is Cheap Pre-Galvanized Walk Through Scaffolding Frame for Sale

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$8.00 / Piece

Sepcifications

  • After-sales Service Online Support
  • Warranty 1 Year
  • Material Steel
  • Type Fixed
  • Structural Style Tower Scaffolding
  • Framework Frame Combined Scaffolding
  • Supporting Mode Suspended Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Installation Scaffold
  • Transport Package Steel Belt Package
  • Specification 1219*1700, 1219*914, 1219*1930, 1219*1524
  • Trademark ADTO GROUP
  • Origin Made in China
  • Customization Available

Product Description

Product Description Frame scaffolding systems are probably one of the most commonly used scaffold system in the construction industry. The ADTO frame scaffold consists of welded steel frames connected by cross braces to form a framework to support scaffold planks or other scaffold platform systems. ...

Learn More

Frame Walk Through Comparison
Transaction Info
Price US $ 8/ Piece Negotiable Negotiable Negotiable US $ 2.80-3.50/ Piece
Min Order 100 Pieces 100 Pieces 100 Pieces 100 Pieces 5000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal
Quality Control
Management System Certification ISO 9001, ISO 14001 ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001
Trade Capacity
Export Markets North America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe South America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Others
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Online Support;
Warranty: 1 Year;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Suspended Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Customization: Available;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Coupler: Scaffolding Coupler;
Scaffold Coupler: Swivel Coupler;
Double Coupler: Steel Coupler;
Pipe Coupler: Optical Coupler;
Scaffolding Double Coupler: Construction Coupler;
Putlog Coupler: Sleeve Coupler;
Drop Forged Coupler: Fix Coupler;
Swivel Coupler Scaffolding: Scaffolding Swivel Coupler;
Fixed Coupler: Pressed Double Coupler;
Right Angle Coupler: Parallel Coupler;
Coupling: Aluminium Formwork Accessories;
Scaffold Clamps: Pipe Clamp;
Clamp: Pipe Coupling;
Pin Connector: Scaffolding Clamp;
Flexible Coupling: Beam Clamp;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Coupler: Scaffolding Coupler;
Scaffold Coupler: Swivel Coupler;
Double Coupler: Steel Coupler;
Pipe Coupler: Optical Coupler;
Scaffolding Double Coupler: Construction Coupler;
Putlog Coupler: Sleeve Coupler;
Drop Forged Coupler: Fix Coupler;
Swivel Coupler Scaffolding: Scaffolding Swivel Coupler;
Fixed Coupler: Pressed Double Coupler;
Right Angle Coupler: Parallel Coupler;
Coupling: Aluminium Formwork Accessories;
Scaffold Clamps: Pipe Clamp;
Clamp: Pipe Coupling;
Pin Connector: Scaffolding Clamp;
Flexible Coupling: Beam Clamp;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Coupler: Scaffolding Coupler;
Scaffold Coupler: Swivel Coupler;
Double Coupler: Steel Coupler;
Pipe Coupler: Optical Coupler;
Scaffolding Double Coupler: Construction Coupler;
Putlog Coupler: Sleeve Coupler;
Drop Forged Coupler: Fix Coupler;
Swivel Coupler Scaffolding: Scaffolding Swivel Coupler;
Fixed Coupler: Pressed Double Coupler;
Right Angle Coupler: Parallel Coupler;
Coupling: Aluminium Formwork Accessories;
Scaffold Clamps: Pipe Clamp;
Clamp: Pipe Coupling;
Pin Connector: Scaffolding Clamp;
Flexible Coupling: Beam Clamp;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Tube Thickness: 2.5-3mm;
Supplier Name

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hebei Hualin International Trade Co., Ltd.

China Supplier - Gold Member Audited Supplier