New Bailey Steel Bridge
US$300.00 / Ton
View
  • Recommend for you
  • What is Construction Bridges Zinc Color Coated Bridge for Sale
  • What is Modern Design Steel Structure Prefab Railway Bailey Bridge
  • What is Good Corrosion Resistance Modular Design Stainless Bailey Bridge

What is High Quality Light Permanent Bailey Steel Truss Structure Bridge Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$300.00 / Ton

Sepcifications

  • After-sales Service Installation Instructions
  • Warranty Life Time
  • Certification GB, ASTM
  • Life Semi-Permanent Bridge
  • Across Way Diffuse Water Bridge
  • Lane Position Half Through Bridge
  • Usage Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
  • Scale Middle Bridge
  • Stress Characteristics Beam Bridge
  • Material Steel Bridge
  • Transport Package Naked
  • Specification ZB321
  • Trademark BAILEY
  • Origin China

Product Description

ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375.0 4809.4 6750.0 321(100) standard truss shear (kN) 245.2 ...

Learn More

New Bailey Steel Bridge Comparison
Transaction Info
Price US $ 300/ Ton US $ 500/ Piece US $ 600/ Piece US $ 600/ Piece US $ 600/ Piece
Min Order 1 Tons 100 Pieces 10 Pieces 20 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification GB, ASTM - - - -
Management System Certification ISO 9001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets South America, Australia, Domestic - - - -
Annual Export Revenue - - - - -
Business Model - OEM OEM OEM OEM
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
After-sales Service: Installation Instructions;
Warranty: Life Time;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Model Number: Gangway 009;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Model Number: Gangway 009;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Model Number: Gangway 009;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Model Number: Gangway 009;
Cleats: Stainless Steel;
Supplier Name

Jiangsu Bailey Steel Bridge Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier