Modular Bridge
US$300.00 / Ton
View
  • Recommend for you
  • What is Fast Assembled Manufacturer Emerging Bailey Type Pedestrian Bridge
  • What is Construction Bridges Zinc Color Coated Bridge for Sale
  • What is Structural Steel Prefabricated Modular Bailey Bridge

What is Modern Design Steel Structure Prefab Temporary Bailey Bridge

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$300.00 / Ton

Sepcifications

  • After-sales Service Installation Instructions
  • Warranty Life Time
  • Certification GB, ASTM
  • Life Semi-Permanent Bridge
  • Across Way Diffuse Water Bridge
  • Lane Position Half Through Bridge
  • Usage Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
  • Scale Middle Bridge
  • Stress Characteristics Beam Bridge
  • Material Steel Bridge
  • Transport Package Naked
  • Specification ZB200
  • Trademark BAILEY
  • Origin China

Product Description

Product Description ZB200 truss press limited table NO. internal force structure form not reinforced model reinforced model SS DS TS QS SSR DSR TSR QSR 200 standard truss moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6 200 standard truss shear (kN) ...

Learn More

Modular Bridge Comparison
Transaction Info
Price US $ 300/ Ton US $ 700/ Piece US $ 700/ Piece US $ 700/ Piece US $ 700/ Piece
Min Order 1 Tons 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification GB, ASTM Ios Ios Ios Ios
Management System Certification ISO 9001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets South America, Australia, Domestic - - - -
Annual Export Revenue - - - - -
Business Model - OEM OEM OEM OEM
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
After-sales Service: Installation Instructions;
Warranty: Life Time;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Scale: Customizes;
Material: Aluminium;
Model Number: Gangway 006;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Scale: Customizes;
Material: Aluminium;
Model Number: Gangway 006;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Scale: Customizes;
Material: Aluminium;
Model Number: Gangway 006;
Cleats: Stainless Steel;
Life: Permanent Bridge;
Across Way: Open Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge;
Scale: Customizes;
Material: Aluminium;
Model Number: Gangway 006;
Cleats: Stainless Steel;
Supplier Name

Jiangsu Bailey Steel Bridge Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shenzhen Horizon Marina Co., Ltd.

China Supplier - Gold Member Audited Supplier