Brewery Equipment
US$52,000.00-95,800.00 / Piece
View
  • Recommend for you
  • What is Cassman 500L Stainless Steel Beer Fermentation Unitank with Dimple Jacket
  • What is Cassman 2000L Stainless Steel Beer Commercial Conical Beer Fermentation Tank
  • What is 5000 Liter Large Micro Beer Brewery, Beer Manufacturing Plant for Sale Brewing Beer Stainless Steel 304

What is Cassman Beer Equipment with UL Certificate Micro Brewery Equipment 15bbl Brewhouse

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 Piece US$95,800.00

2+ Pieces US$52,000.00

Sepcifications

  • After-sales Service 2 Years for The Tanks, 6 Months for The Electrical
  • Warranty 2 Years for The Tanks, 6 Months for The Electrical
  • Processing Material Special Agricultural Products
  • Application Beverage
  • Customized Customized
  • Certification CE, ISO9001
  • Power Source Gas
  • Automatic Grade Semi-Automatic
  • Transport Package Wooden Package or Iron Frame
  • Specification 15bbL
  • Trademark Cassman
  • Origin Jinan China
  • Thickness Inner 4mm/External 2mm
  • Heating Way Gas/ Electric/Steam
  • Hot Water Tank Include
  • Motor Include
  • Pipes Include
  • Work Platform Include
  • Capacity 50L-5000L
  • Fermenter Customized
  • Size Customized
  • Cooling Way Glycol Dimple Cooling Jacket
  • Control System PLC/ Pid
  • Insulation Rock Wool/Polyurethane
  • Logo Customized
  • Pressure Test 3 Bar, Work 0.5 Bar
  • Test Before Shipping

Product Description

Cassman Beer Equipment with UL Certificate Micro Brewery Equipment 15bbl brewhouse Configuration of 2 vessels Cassman 15bbl Beer Brewing Equipment for Micro Brewery with UL Certificate 1. 15bbL Mash/Lauter tank, VFD top motor, Reversible motor for spent malt. False bottom. 2. 15bbL ...

Learn More

Brewery Equipment Comparison
Transaction Info
Price US $ 52,000.00-95,800.00/ Piece US $ 347,000.00-1,581,000.00/ Set US $ 347,000.00-1,581,000.00/ Set US $ 8,452,000.00-28,573,000.00/ Set US $ 8,452,000.00-28,573,000.00/ Set
Min Order 1 Pieces 1 Sets 1 Sets 1 Sets 1 Sets
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification CE, ISO9001 CE, ISO9001 CE, ISO9001 CE, ISO9001 CE, ISO9001
Management System Certification ISO 9001, ISO 9000, ISO 14000, ISO 20000, ISO 10012 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Eastern Europe, Oceania, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
After-sales Service: 2 Years for The Tanks, 6 Months for The Electrical;
Warranty: 2 Years for The Tanks, 6 Months for The Electrical;
Processing Material: Special Agricultural Products;
Application: Beverage;
Customized: Customized;
Power Source: Gas;
Automatic Grade: Semi-Automatic;
Thickness: Inner 4mm/External 2mm;
Heating Way: Gas/ Electric/Steam;
Hot Water Tank: Include;
Motor: Include;
Pipes: Include;
Work Platform: Include;
Capacity: 50L-5000L;
Fermenter: Customized;
Size: Customized;
Cooling Way: Glycol Dimple Cooling Jacket;
Control System: PLC/ Pid;
Insulation: Rock Wool/Polyurethane;
Logo: Customized;
Pressure: Test 3 Bar, Work 0.5 Bar;
Test: Before Shipping;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Materia: Corn Starch or Tapioca Starch;
Product Name: Modified Starch Production Line Equipment;
Equipment Name: Oxidized Starch Equipment;
Process: Chemical Modification;
Final Product: Modified Starch, Oxidated Starch;
Equipment Included: Reactor, Hydrocyclone, Peeler Centrifuge;
Workers Qty: 8-10 Workers Per Shift;
Installation Time: 3-6 Months;
Capacity: 10-300tpd Output;
Construction Area: 2000-10000m2;
Drying Equipment: Flash Dryer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Materia: Corn Starch or Tapioca Starch;
Product Name: Modified Starch Production Line Equipment;
Equipment Name: Oxidized Starch Equipment;
Process: Chemical Modification;
Final Product: Modified Starch, Oxidated Starch;
Equipment Included: Reactor, Hydrocyclone, Peeler Centrifuge;
Workers Qty: 8-10 Workers Per Shift;
Installation Time: 3-6 Months;
Capacity: 10-300tpd Output;
Construction Area: 2000-10000m2;
Drying Equipment: Flash Dryer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Supplier Name

Jinan Cassman Machinery Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier