Beer Brewery Equipment
US$2,000.00-3,000.00 / Piece
View
  • Recommend for you
  • What is 5000 Liter Large Micro Beer Brewery, Beer Manufacturing Plant for Sale Brewing Beer Stainless Steel 304
  • What is Cassman 500L Stainless Steel Beer Fermentation Unitank with Dimple Jacket
  • What is Cassman Hot Sale 1000L/2000L Industrial Stainless Steel Beer Brewery Equipment for Sale

What is 25bbl Stainless Steel Brewing Equipment

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 Piece US$3,000.00

2+ Pieces US$2,000.00

Sepcifications

  • After-sales Service After Sales
  • Warranty 2 Years
  • Processing Material Natural Ingredients
  • Application Beverage
  • Customized Customized
  • Certification CE
  • Power Source Electric
  • Automatic Grade Semi-Automatic
  • Transport Package Iron Frame + Wooden Box
  • Specification 300L-20000L
  • Trademark Cassman
  • Origin Jinan
  • Parts 1 100-2000L Fermenters/Bbt
  • Parts 2 100L-5000L Brewhouse 2,3,4 Vessels
  • Parts 3 Hot Liquor Tank
  • Parts 4 Cold Liquor Tank
  • Parts 5 50L 100L 200L 300L CIP
  • Parts 6 Chiller
  • Parts 7 Malt Mill
  • Parts 8 Control System
  • Drawing Provided Before Production, Customized

Product Description

25BBL Stainless steel brewing equipment Cassman Beer Brewing system is designed for brewing craft beer with commercial purposes in large brew pub, microbrewery, nanobrewery, beer hall or distribution. Cassman brewing systems come with various heating methods including electric, steam and gas ...

Learn More

Beer Brewery Equipment Comparison
Transaction Info
Price US $ 2,000.00-3,000.00/ Piece Negotiable US $ 8,452,000.00-28,573,000.00/ Set US $ 8,452,000.00-28,573,000.00/ Set US $ 8,452,000.00-28,573,000.00/ Set
Min Order 1 Pieces 1 Pieces 1 Sets 1 Sets 1 Sets
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification CE CE CE, ISO9001 CE, ISO9001 CE, ISO9001
Management System Certification ISO 9001, ISO 9000, ISO 14000, ISO 20000, ISO 10012 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Eastern Europe, Oceania, Western Europe Europe, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
After-sales Service: After Sales;
Warranty: 2 Years;
Processing Material: Natural Ingredients;
Application: Beverage;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Parts 1: 100-2000L Fermenters/Bbt;
Parts 2: 100L-5000L Brewhouse 2,3,4 Vessels;
Parts 3: Hot Liquor Tank;
Parts 4: Cold Liquor Tank;
Parts 5: 50L 100L 200L 300L CIP;
Parts 6: Chiller;
Parts 7: Malt Mill;
Parts 8: Control System;
Drawing: Provided Before Production, Customized;
After-sales Service: Engineer Avaliable or Online Service;
Warranty: 1 Year;
Processing Material: Natural Ingredients, Compound Chocolate;
Application: Chocolate;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Supplier Name

Jinan Cassman Machinery Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Suzhou Lejoy Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

China Supplier - Diamond Member Audited Supplier