U Channel Glass Railing
US$99.00 / Piece
View
  • Recommend for you
  • What is Prima Good-Quality Contemporary Modern Designs Post Glass Railings
  • What is Prima Glass Clamp Balustrade Square Style Square Post Railing Fitting
  • What is Powder Coated Welding Garden Ornamental Decorative Metal Aluminum Fence Lattice Railings

What is Prima U Channel Glass Railing with Accessories Hot-Sale Metal U Channel Glass Railing

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$99.00 / Piece

Sepcifications

  • After-sales Service Online Installation Instruction
  • Warranty 5
  • Frame Finishing Powder Coated
  • Surface Treatment Coated
  • Material Aluminum
  • Transport Package Packed on Wooden Pallet Bound
  • Specification Custom
  • Trademark PRIMA
  • Origin Guangdong, China
  • Application Outdoor/Indoor
  • Type Tempered Glass Railings
  • Handrail Materials Stainless Steel 304/316 Aluminum
  • Color Requirement
  • Size Customer Size Accepted
  • Finish Brushed/Polished
  • Function Balacony/Deck/Porch/Terrace

Product Description

Prima factory Every staircase, we will arrange trial-assemble before delivery to make sure that the staircases were fabricated based on the shop drawings. Below are some test assembled pictures. If you want to know more, please contact us, we will show you more details. Packaging &Shipping ...

Learn More

U Channel Glass Railing Comparison
Transaction Info
Price US $ 99/ Piece US $ 24.00-32.00/ pieces US $ 70.00-80.00/ Meter US $ 70.00-80.00/ Meter US $ 70.00-80.00/ Meter
Min Order 1 Pieces 1 pieces 1 Meters 1 Meters 1 Meters
Trade Terms - - - - -
Payment Terms T/T, Paypal, Money Gram L/C, T/T, D/P, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification - ISO9001, CE, TUV CE, SGCC, CCC CE, SGCC, CCC,as Nzs2208 CE, SGCC, CCC
Management System Certification - ISO 9001 ISO 9001, ISO 9000, ISO 14000, ISO 20000 ISO 9001, ISO 9000, ISO 14000, ISO 20000 ISO 9001, ISO 9000, ISO 14000, ISO 20000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, Europe, Southeast Asia/ Mideast, Australia North America, Europe, Southeast Asia/ Mideast, Australia North America, Europe, Southeast Asia/ Mideast, Australia
Annual Export Revenue - - - - -
Business Model - - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
- Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
After-sales Service: Online Installation Instruction;
Warranty: 5;
Frame Finishing: Powder Coated;
Surface Treatment: Coated;
Material: Aluminum;
Application: Outdoor/Indoor;
Type: Tempered Glass Railings;
Handrail Materials: Stainless Steel 304/316 Aluminum;
Color: Requirement;
Size: Customer Size Accepted;
Finish: Brushed/Polished;
Function: Balacony/Deck/Porch/Terrace;
After-sales Service: Online Technical Support, on-Site Installation, on;
Warranty: 3 Years or More;
Surface Treatment: Mirror/Sand/PVD;
Material: Aluminum;
Installation: Floor;
Quality Control: Each Item Will Be Inspected Before Shipment;
Supply Capacity: 10,000 Meters/Month,Depends on Peak Season;
After-sales Service: Online Technical Support;
Warranty: 5 Years;
Frame Finishing: Not Coated;
Surface Treatment: Brushed/Mirror;
Material: Stainless Steel;
Product Name: Standoff Glass Railing;
Color: Silver/Customized;
Installation: Easy DIY Install;
Accessories: Expanding Screw;
Certificate: SGCC/CE/CCC/as Nzs2208;
Package: Polywood Case;
Delivery Time: 25-35 Days;
Size: Customer Size Accepted;
Quality: High Quality;
After-sales Service: Online Technical Support;
Warranty: 5 Years;
Frame Finishing: Not Coated;
Surface Treatment: Brushed/Mirror;
Material: Stainless Steel;
Product Name: Standoff Glass Railing;
Color: Silver/Customized;
Installation: Easy DIY Install;
Accessories: Expanding Screw;
Certificate: SGCC/CE/CCC/as Nzs2208;
Package: Polywood Case;
Delivery Time: 25-35 Days;
Size: Customer Size Accepted;
Quality: High Quality;
After-sales Service: Online Technical Support;
Warranty: 5 Years;
Frame Finishing: Not Coated;
Surface Treatment: Brushed/Mirror;
Material: Stainless Steel;
Product Name: Standoff Glass Railing;
Color: Silver/Customized;
Installation: Easy DIY Install;
Accessories: Expanding Screw;
Certificate: SGCC/CE/CCC/as Nzs2208;
Package: Polywood Case;
Delivery Time: 25-35 Days;
Size: Customer Size Accepted;
Quality: High Quality;
Supplier Name

Shenzhen CBDMART Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Nanhai Yuexing Hardware Products Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Double Building Materials Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Double Building Materials Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Double Building Materials Co., Ltd.

China Supplier - Diamond Member Audited Supplier