Specification |
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Hot Rolled;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Alloy;
Special Use: Wear Resistant Steel, Free Cutting Steel, Mold Steel;
Heat Treatment: Annealing/Q+T;
Test: SGS/Ut 100%/Element Testing;
Grade: 1.6523, SAE8620, 20CrNiMo;
Payment: 30%Deposit, Blance by L/C at Sight or T/T;
Delivery Quatity: Include MOQ;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|
Standard: DIN, JIS, AISI, ASTM, GB, BS;
Technics: Cold Drawn;
Application: Structural Steel Bar;
Surface: Black;
Alloy: Non-alloy;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Form/Shape: Sheet, Plate, Bar, Rod, Tube, Pipe, Strip, Foil an;
Payment: T/T 30% Prepayment, 70% Balance Before Delivery;
Delivery Time: 2-10 Working Days After Getting The Prepayment;
|