Specification |
After-sales Service: Yes;
Warranty: 1year;
Type: Cold Bending Inner Edge Channel;
Standard: GB, ASTM, JIS, AISI, DIN;
Shape: C Channel;
Perforated: Perforated;
Material: Q195, Q235, Q345, SS304, SS316L Slotted U Channel;
Pregalvanized Coating: Z100-Z275;
Delivery Length: 3m, 6m or Custom;
Capacity: 3000tons/Year;
Delivery: in 30days After Order Confirmation;
|
After-sales Service: on Line;
Warranty: 3 Years;
Type: Cold Bending Equal Channel;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Shape: U Channel C Channel;
Perforated: Not Perforated;
Length: 5-19m;
Delivery Time: Within 7 Working Days;
MOQ: 1 Ton;
Thickness: 0.8mm-5.8mm, or Customized;
Lengths: 1.0m-6.0m, or Customized;
Technique: Cold Rolled Hot Rolled;
Application: Building Structures Industry Structures;
Processing Servic: Bending, Welding, Decoiling, Punching, Cutting;
Surface: Natural Surface;
|
After-sales Service: on Line;
Warranty: on Line;
Type: Cold Bending Equal Channel;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Shape: U/C Channel;
Perforated: Not Perforated;
Length: 1-12m or as Required;
Product Name: Channel Beam;
Height: 50-300mm or as Required;
Tolerance: +/-5%;
Usage: Construction Structure,Transmission Towers;
Technique: Hot Rolled;
Delivery Time: About 7-15 Days;
MOQ: 1 Ton;
|
After-sales Service: 24 Hours Online;
Warranty: 2 Years;
Type: Cold Bending Equal Channel;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Shape: U/C Channel;
Perforated: Not Perforated;
Length: 1-12m or as Required;
Product Name: Channel Beam;
Height: 50-300mm or as Required;
Tolerance: +/-5%;
Usage: Construction Structure, Transmission Towers;
Technique: Hot Rolled;
Delivery Time: About 7-15 Days;
MOQ: 1 Ton;
|
After-sales Service: on Line;
Warranty: on Line;
Type: Cold Bending Equal Channel;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Shape: U/C Channel;
Perforated: Not Perforated;
Length: 1-12m or as Required;
Product Name: Channel Beam;
Height: 50-300mm or as Required;
Tolerance: +/-5%;
Usage: Construction Structure,Transmission Towers;
Technique: Hot Rolled;
Delivery Time: About 7-15 Days;
MOQ: 1 Ton;
|