Rongdu Mould Plastic Injection Waste Bin Container Office Using Box Mold

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$3,000.00-10,000.00 / Set

Sepcifications

  • Warranty 1 Year
  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material PE
  • Process Combination Type Plastic Injection Mould
  • Application Household Appliances, Industrial Appliances
  • Runner Hot Runner
  • Design Software UG
  • Installation Fixed
  • Certification TUV
  • Standard DME
  • Customized Customized
  • After-sales Service with in 24 Hours Online Guidance
  • Transport Package Wooden Case
  • Specification 360L
  • Trademark Rongdu Mould
  • Origin China
  • Mould Steel for Core HP20, H718, 2738
  • Mould Steel for Basement S50c
  • Mould Treatment Nitridation, Quencher, Heat-Treated, Pre-Hardening
  • Mould Tooling Precision 5-Axis Tooling Machine
  • Hot Runner System Yudo, Mold Master, Chinese Brand
  • Cooling System Beryllium-Bronze Insert
  • Ejection System Ejector Pin & Plate
  • Hydraulic Cylinder Taiwan Brand
  • Mould Cycle Time 100s
  • Mould Delivery Time 60 Days
  • Mould Life More Than 500K Shoots
  • Mould Guarantee 1 Year
  • Product Loading Ability Well Standard

Product Description

RONGDU MOULD 120L 240L 360L 660L 1200L industrial waste bin mold Plastic waste bin mold, it could use on industrial area, city area, house using etc. Rongdu could make the high efficient manufacturing for waste bin mold. Our waste bin Mold have many advantages, like we using YUDO HOT RUNNER brand, ...

Learn More

Industrial Waste Bin Mould Comparison
Transaction Info
Price US $ 3,000.00-10,000.00/ Set US $ 3,000.00-5,000.00/ Piece US $ 6,000.00-9,000.00/ Piece US $ 3000/ Set US $ 8000/ Set
Min Order 1 Sets 1 Pieces 1 Pieces 1 Sets 1 Sets
Trade Terms - FOB, CFR, CIF FOB, CFR, CIF, EXW FOB, CIF FOB, CIF
Payment Terms L/C, T/T, Paypal L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T L/C, T/T
Quality Control
Product Certification TUV ISO, null ISO, null - -
Management System Certification ISO 9001 ISO 9001, IATF16949 ISO 9001, IATF16949 ISO 9001, ISO 20000 ISO 9001, ISO 20000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, Europe, Southeast Asia/ Mideast North America, Europe, Southeast Asia/ Mideast North America, South America, Southeast Asia/ Mideast North America, South America, Southeast Asia/ Mideast
Annual Export Revenue - - - - -
Business Model OEM, ODM - - OEM, ODM OEM, ODM
Average Lead Time Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Plastic Injection Mould;
Application: Household Appliances, Industrial Appliances;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: with in 24 Hours Online Guidance;
Mould Steel for Core: HP20, H718, 2738;
Mould Steel for Basement: S50c;
Mould Treatment: Nitridation, Quencher, Heat-Treated, Pre-Hardening;
Mould Tooling Precision: 5-Axis Tooling Machine;
Hot Runner System: Yudo, Mold Master, Chinese Brand;
Cooling System: Beryllium-Bronze Insert;
Ejection System: Ejector Pin & Plate;
Hydraulic Cylinder: Taiwan Brand;
Mould Cycle Time: 100s;
Mould Delivery Time: 60 Days;
Mould Life: More Than 500K Shoots;
Mould Guarantee: 1 Year;
Product Loading Ability: Well Standard;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Furniture, Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Name: Plastic Rice Basket Mould;
Structure: According to Your Drawing/Sample;
Lead Time: 60-90 Days;
Warranty Period: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Motorcycle;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Size/Structure: According to Your Drawing/Sample;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Mirror Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Compound Die;
Application: Household Appliances, Furniture, Commodity, Home Use;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: HASCO;
Customized: Customized;
After-sales Service: Technical Guidance;
Name: Foot Massage Tub Mould;
Cavity: 1;
Mould Life: 1000000;
Shape: Oval;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Mirror Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Compound Die;
Application: Household Appliances, Furniture, Commodity, Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: HASCO;
Customized: Customized;
After-sales Service: Technical Guidance;
Name: Bowl Mould;
Mould Life: 1000000 Shots;
Cavity: 1;
Delivery Time: 45 Days;
Supplier Name

Taizhou Huangyan Rongdu Mould Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou Huangyan Ningguang Mould Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taizhou Huangyan Ningguang Mould Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taizhou Huangyan Caozhen Mould Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou Huangyan Caozhen Mould Co., Ltd.

China Supplier - Diamond Member Audited Supplier