| Specification |
After-sales Service: Arrange Technician for Installation Machines;
Warranty: 1 Year;
Processing Material: Agronomic Products;
Application: Rice;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
Product: Nutrition Rice Processing Line;
Raw Material: Rice and Other Grain;
Capacity: 80-120kg/H,180-200kg/H,300kg/H;
Machine Material: Stainless Steel;
Main Drive Power: 59/84/158kw;
Installed Power: 84/120/225kw;
Main Motor: Siemens Brand From China;
Inverter: Delta Brand From Taiwan;
Circuit Breaker: LG Brand From South Korea;
Electric Parts: LG From South Korea,FUJI,Omron From Japan etc;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic/Semi-Automatic/Manual;
Product Name: Starch Production Line Equipment/Design;
Process: Corn Wet Milling/Chemical Modification;
Installation Time: 3-6 Months;
Final Product: Modified Starch, Corn Starch, Germ, Fiber, Gluten;
Workers Qty: 8-10 Workers Per Shift;
Capacity: 10-300tpd Output;
Raw Material: Corn/ Maize;
Key Equipment: Degerm Mill, Starch Dryer, Pressure Screen;
|
After-sales Service: Lifelong;
Warranty: One Year;
Processing Material: Animal Raw Materials, Special Agricultural Products;
Application: Dairy, Beverage;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
Material: SS304, SS316L;
Motor: Top Motor;
Temperature Insulation: Rock Wool;
Finish: Sanitary Grade;
R.E.V: 36rpm;
Heating Way: Steam;
|
Processing Material: Agronomic Products;
Application: Food/Makeup;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic/Semi-Automatic/Manual;
Capacity: Design as Required;
Installation Time: 2-4months;
Worker Qty.: 10-20 Persons Per Shift;
Service: Engineers Available to Service Oversea;
|
Processing Material: Agronomic Products;
Application: Food/Makeup;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic/Semi-Automatic/Manual;
Capacity: Design as Required;
Installation Time: 2-4months;
Worker Qty.: 10-20 Persons Per Shift;
Service: Engineers Available to Service Oversea;
|