4-flute R end mills with straight shank and long neck and shork cutting edge

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$12.77-109.69 / Piece

Sepcifications

  • Condition New
  • Certification CE, RoHS
  • Standard DIN, ASTM, GOST
  • Customized Non-Customized
  • Material Tungsten Carbide
  • Application Metal Processing Machinery Parts
  • Transport Package Plastic+Carton
  • Specification 10pcs/package
  • Trademark STC
  • Origin China

Product Description

HM(HMX)-4RP Series Solid Carbide End mill Brand: ZCCCT Commodity: HMX(HM) series Solid Carbide Endmill Substrate: 0.4~0.6µ micro grain WC, imported caribde rods. Coating: HM has nano-ALTIN coating(PVD), grey black color. HMX coated with nano-ALTIN and added special element, brozen color. ...

Learn More

End Mill Comparison
Transaction Info
Price US $ 12.77-109.69/ Piece US $ 0.90-1.10/ Piece US $ 0.90-1.10/ Piece US $ 1.80-32.00/ Piece US $ 0.50-13.00/ Piece
Min Order 1 Pieces 500 Pieces 500 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms T/T, Western Union, Paypal L/C, T/T, Negotiable L/C, T/T, Negotiable L/C, T/T, D/P, Western Union, Paypal, Money Gram, or as customer request L/C, T/T, or as customer request
Quality Control
Product Certification CE, RoHS ISO9001 ISO9001 CE, RoHS, GS, ISO9001 CE, RoHS, GS, ISO9001
Management System Certification ISO 9001, ISO 14000, GAP ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia North America, Eastern Europe, Oceania, Western Europe North America, Eastern Europe, Oceania, Western Europe North America, South America, Europe North America, South America, Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM OEM OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Condition: New;
Standard: DIN, ASTM, GOST;
Customized: Non-Customized;
Material: Tungsten Carbide;
Application: Metal Processing Machinery Parts;
Condition: New;
Customized: Customized;
Material: Stainless Steel;
Condition: New;
Customized: Customized;
Material: Stainless Steel;
Condition: New;
Standard: DIN, ASTM, GOST, GB, JIS, ANSI, BS;
Customized: Customized;
Material: Aluminum;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery;
Item Name: Laser Cutting Processing Aluminium CNC Machining C;
Material Capabilities: Aluminium Alloy Zl101, A356, ADC12, Alsi7mg;
Manufacturing Process: Die Casting, Option Gravity Casting, Low Pressure;
Casting Tolerance: CT5-7 for Laser Cutting CNC Machining Components;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Treatment: Anodize, Painting;
Rough Surface Roughness: Ra0.8-3.2 for Laser Cutting CNC Machining Componen;
Package for Zinc Casting: Multiplayer Wood Box/Pallet, with Big Plastic Bag;
Lead Time: 45 Days for Laser Cutting CNC Machining Components;
Service for Zinc Casting: Custom Parts Based on Drawing or Sample;
Condition: New;
Standard: DIN, ASTM, GOST, GB, JIS, ANSI, BS;
Customized: Customized;
Material: Metal;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery;
Specfication: Customized Size Based on Drawing;
Material Capabilities: Aluminium Alloy Zl101, A356, ADC12, Alsi7mg;
Manufacturing Process: Die Casting, Option Gravity Casting, Low Pressure;
Casting Tolerance: CT5-7 for Zinc Diecasting Components;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Treatment: Anodize, Painting,Power Coating;
Rough Surface Roughness: Ra3.2-25 for Zinc Diecasting Components;
Package for Zinc Casting: Multiplayer Wood Box/Pallet, with Big Plastic Bag;
Lead Time: 45 Days for Zinc Diecasting Components;
Service for Zinc Casting: Custom Parts Based on Drawing or Sample;
Supplier Name

Zhuzhou Chu Strong Tools Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo Nathan Machinery Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo Nathan Machinery Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shanghai Matech Machinery Manufacture Corporation Ltd.

China Supplier - Diamond Member Audited Supplier

Shanghai Matech Machinery Manufacture Corporation Ltd.

China Supplier - Diamond Member Audited Supplier