Pipe Support
US$8.00-18.00 / Piece
View
  • Recommend for you
  • What is Cast Rapid Clamp Formwork Parts Rapid Clamp for Construction
  • What is Custom Scaffolding Formwork Wing Nut Anchor Nut for Steel Tie Rod
  • What is Formwork Tie Rod System Concrete Casting Combination Wing Nut

What is High Loading Capacity Adjustable Shoring Steel Prop for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$8.00-18.00 / Piece

Sepcifications

  • After-sales Service Online Technical Support
  • Warranty Online Technical Support
  • Certification ISO, SGS
  • Material Steel
  • Type Wall Formwork
  • Transport Package in Bundles
  • Specification 1.4-2.7m
  • Trademark JDG
  • Origin Hebei, China
  • Duty Type Light Duty/MID-Duty/Heavy Duty
  • Surface Treatment Hot Galvanized/ Painting
  • Plate 120*120mm
  • Plate Thickness 6mm
  • Outer Pipe 56mm
  • Inner Pipe 48mm
  • Length 1.6-2.9m
  • Weight 8.81kg

Product Description

Product Description Item Name Adjustable Steel Shoring Prop Material Q355, Q235, or as your request 1.6mm,1.7mm,1.8mm,2mm, 2.75mm, 3.0mm or as your request Hot Dip Galvanized, or Painted Type Light duty, heavy duty Adjustable Length 1.6-2.9m Outer Tube 48mm,56mm, 60mm, 76mm or as your ...

Learn More

Pipe Support Comparison
Transaction Info
Price US $ 8.00-18.00/ Piece US $ 18.00-22.00/ Piece US $ 20.00-31.00/ Piece US $ 20.00-31.00/ Piece US $ 21.00-31.00/ Piece
Min Order 100 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram T/T T/T T/T T/T
Quality Control
Product Certification ISO, SGS ISO ISO ISO ISO
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea)
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
After-sales Service: Online Technical Support;
Warranty: Online Technical Support;
Material: Steel;
Type: Wall Formwork;
Duty Type: Light Duty/MID-Duty/Heavy Duty;
Surface Treatment: Hot Galvanized/ Painting;
Plate: 120*120mm;
Plate Thickness: 6mm;
Outer Pipe: 56mm;
Inner Pipe: 48mm;
Length: 1.6-2.9m;
Weight: 8.81kg;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Supplier Name

Cangzhou JDG Scaffolding Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier