Specification |
Media: Water, Oil;
Temperature: T≦90ºC;
Actuator: Manual;
Material: Brass;
Application: Lining Fluorine Valve, Needle Type Globe Valve, Cryogenic Globe Valve, Plunger Type Globe Valve, Heat Preservation Globe Valve, Forged Steel Globe Valve, Oxygen Globe Valve, Bellows Globe Valve;
Service: OEM/ODM;
|
Media: Oil;
Temperature: Ordinary Temperature;
Actuator: Manual;
Material: Cast Steel;
Structure: Through Way Globe Valve;
Sealing Form: Swivel Plug;
Stem Thread Position: Outside Screw Stem Globe Valve;
Application: on-off;
Standard: DIN, ANSI, JIS;
Design: ASME B16.34, BS1873,API 623;
Face to Face: ASME B16.10, En558;
End Connection: ASME B16.5, ASME B16.47,En1092;
Inspection and Test: API 598, En 12266;
Size Range: Nps 2- Nps 24 (DN50-DN600);
Pressure Rating: Cl150-Cl900;
Bonnet Type: Bolted Bonnet;
Body: Wcb;
Trim: A105+Stellite;
Warranty Time: 120 Days After Shipment;
Certificates: API 6D, CE, ISO9001, Eac 010/032, API 607, Sil, Is;
|
Media: Gas;
Temperature: Low Temperature;
Actuator: Pneumatic;
Material: Steel;
Structure: Through Way Globe Valve;
Sealing Form: Bellows Globe Valve;
Standard: DIN;
|
Actuator: Manual;
Material: Forged;
Structure: Through Way Globe Valve;
Sealing Form: Gland Packings Globe Valve;
Stem Thread Position: Outside Screw Stem Globe Valve;
Application: Lining Fluorine Valve, Needle Type Globe Valve, Cryogenic Globe Valve, Plunger Type Globe Valve, Heat Preservation Globe Valve, Forged Steel Globe Valve, Oxygen Globe Valve, Bellows Globe Valve;
Standard: DIN, ANSI, BSW, JIS;
Characteristic: Forged Steel Globe Valve;
Design & Manufacture: API 602, BS5352, ASME B16.34;
Pre-Temp. Rating: ASME B16.34;
Face to Face: ASME B16.10;
Ends Connection: Sw, Bw, NPT, RF, Rtj;
Inspect & Test: API 598;
Certificate 1: Dnv CE 0575;
Certificate 2: ISO 9001: 2008;
|
Media: Gas;
Temperature: Ordinary Temperature;
Actuator: Manual/Pneumatic/Electrical;
Material: Stainless Steel;
Application: Manual/Pneumatic/Electrical;
Working Pressure: Class150lb-2500lb;
Connection Ends: Flange & Welding;
Delivery Time: 15~20 Days;
MOQ: 5PCS;
|