Specification |
Standard: GB;
Surface Treatment: Anodizing, Painting, Phosphating, Passivation...;
Customization: Yes;
Heat Treatment: Hardening, Normalizing, Annealing, Tempering...;
Process: Machining, Turning, Milling, Stamping, Forging, Ca;
|
Application: Auto and Motorcycle Accessory, Machinery Accessory;
Standard: GB, EN, JIS Code, TEMA, ASME;
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Steel, Brass, Alloy, Aluminum;
Description: Turbo Intake Exhaust Manifold Gaskets and Flanges;
Lead Time: 30 Days;
Shipping: Ocean or Airplane;
MOQ: 10PCS;
Tolerance: +/- 0.005mm, According to Your Specification;
Material Capabilities: Aluminum, Brass, Steel, Titanium etc.;
Process: CNC Machining/CNC Turning/CNC Milling/CNC Lathe;
|
Application: Fastener, Auto and Motorcycle Accessory, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Polishing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Drawing Format: 2D/(Pdf/CAD)3D(Iges/Step);
Equipment: CNC Lathe Machine/Milling Machine/Turning Machine;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Spray Paint;
Production Type: Batch Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Other Surface Treatment: Nickel Plating; Chrome Plating; Zinc Plating etc;
Other Processable Materials: Aluminum,Brass,Copper/Bronze,Stainless Steel,Alloy;
Min. Order Quantity: One Piece;
Custom Type: Customized by Drawing or Sample;
|
Application: Auto and Motorcycle Accessory, Machinery Accessory;
Standard: GB, EN, China GB Code, ASME;
Surface Treatment: Anodizing;
Production Type: Batch Production;
Machining Method: CNC Machining;
Material: Steel, Brass, Alloy, Copper, Aluminum, Iron;
Description: Billet Aluminum Shift Arm Base Shifter Bracket;
Lead Time: 30 Days;
Shipping: Ocean or Airplane;
MOQ: 10PCS;
Tolerance: +/- 0.005mm, According to Your Specification;
Material Capabilities: Aluminum, Brass, Steel, Titanium etc.;
Process: CNC Machining/CNC Turning/CNC Milling/CNC Lathe;
|