Formwork System
US$81.00-161.00 / Piece
View
  • Recommend for you
  • What is Bridge Propping Construction Formwork and Scaffolding Steel Slab
  • What is Heavy Duty Shoring Beam Concrete Formwork Construction
  • What is Steel Structure Waler Beam with 100 Ton Jack for Concrete Formwork System

What is Leger Building Material Brace Hot DIP Galvanized Steel Beam System Aluminium Formwork System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$81.00-161.00 / Piece

Sepcifications

  • After-sales Service Provide After Sale Service
  • Warranty Provide After Sale Service
  • Certification ISO
  • Material Steel
  • Type Beam Formwork
  • Transport Package Normal Package
  • Specification 900MM
  • Trademark OEM/ODM
  • Origin China
  • Certificated ISO9001
  • Steel Q235/Q355
  • Finished HDG/Painted
  • Usage Formwork
  • Function Shoring System

Product Description

leger Building material Brace Hot dip galvanized steel beam system aluminium formwork system Mega beam is a versatile temporary modular heavy-duty propping system that can be adapted to the most demanding projects on construction sites. Its most frequent uses are the support of bridges, ...

Learn More

Formwork System Comparison
Transaction Info
Price US $ 81.00-161.00/ Piece US $ 1.35-6.90/ Meter US $ 70.00-90.00/ Square Meter US $ 0.09-0.58/ Piece US $ 499/ Set
Min Order 1 Pieces 10000 Meters 300 Square Meters 2000 Pieces 30 Sets
Trade Terms - - - - -
Payment Terms T/T T/T L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T
Quality Control
Product Certification ISO - ISO, CE ISO, ROHS, CE, SGS ISO
Management System Certification ISO 9001 - ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Europe, East Asia(Japan/ South Korea) South America, Australia North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Certificated: ISO9001;
Steel: Q235/Q355;
Finished: HDG/Painted;
Usage: Formwork;
Function: Shoring System;
Material: Galvanized Plate;
Type: Wall Formwork;
After-sales Service: Yes;
Warranty: 1 Year;
Material: Steel Wood;
Type: Slab Formwork;
Transportation: by Trolley or Crane;
Customized Size: Available;
Auxiliary Equipment: Table Formwork;
Material: 50# Mn Steel;
Type: Wall Formwork;
After-sales Service: Yes;
Warranty: 1 Year;
Material: Steel Wood;
Type: Tunnel Formwork;
Surface Finish: Paint, Powder Coated, Electro Galvanization,Hot Di;
Work Load Capacity: 20kn & 30kn;
Construction Properties: Building Scaffold;
Supporting Mode: Floor Type Scaffolding;
Supplier Name

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

ANPING CHIYUN WIRE MESH MANUFACTURING CO., LTD

China Supplier - Gold Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

China Supplier - Diamond Member Audited Supplier

Hebei Santhriving Import and Export Co., Ltd

China Supplier - Diamond Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

China Supplier - Diamond Member Audited Supplier