240mm Width Galvanized Steel Ringlock Scaffold System Components Walking Plank with Hook for Slab Scaffolding System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$78.00-125.00 / Piece

Sepcifications

  • After-sales Service Provide After Sale Service
  • Warranty Provide After Sale Service
  • Material Steel
  • Type Scaffold
  • Structural Style Tower Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Scaffolding
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Normal Package
  • Specification 48.3mm
  • Trademark OEM/ODM
  • Origin China
  • Certificate ISO9001/SGS
  • Finished Galvanized
  • Usage Scaffolding System
  • Function Scaffold/Building Material

Product Description

240mm width galvanized steel ringlock scaffold system components walking plank with hook for slab scaffolding system Dimensions Standard Building material galivanized scaffolding base ringlock jack base Code Description RFH-B001A 19.7in 500mm 39.4in 1000mm 47.2in 1500mm ...

Learn More

Scaffolding System Comparison
Transaction Info
Price US $ 78.00-125.00/ Piece US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece
Min Order 100 Pieces 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification ISO9001/SGS En12810 En12810 En12810 En12810
Management System Certification ISO 9001 ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets Europe, East Asia(Japan/ South Korea) Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Scaffold;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Finished: Galvanized;
Usage: Scaffolding System;
Function: Scaffold/Building Material;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Supplier Name

Taishan Dongkuo Steel Structure Co., Ltd.

China Supplier - Gold Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier