Specification |
Processing Object: Metal;
Molding Style: Forging;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Quenching, Tempering, Annealing, Normalizing;
Surface Treatment: Customized;
Forging Tolerance: 0.02mm-0.1mm;
Standard: ISO, DIN, ASTM, BS Ect.;
Product Name: Forging Customized Parts;
Shape: Customer Required;
Quality Control: 100% Inspection;
Delivery Time: 30 Days;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Open-Die Forging;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Normalizing;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASME;
Customization: Available;
Production Drawing: Available;
Color: Metal Basic Color Grey Color Black;
Lead Time: 10-25days;
Materials: CS, Dss, Alloy Steel, 4130, 4340, 4140;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Open-Die Forging;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Normalizing;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASME;
Materials: CS, Dss, Alloy Steel, 4130, 4340, 4140;
Customization: Available;
Production Drawing: Available;
Lead Time: 10-25days;
Color: Metal Basic Color Grey Color Black;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Open-Die Forging;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Normalizing;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASME;
Materials: CS, Dss, Alloy Steel, 4130, 4340, 4140;
Customization: Available;
Production Drawing: Available;
Lead Time: 10-25days;
Color: Metal Basic Color Grey Color Black;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Forged;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Normalizing;
Surface Treatment: Sand Blasting;
Forging Tolerance: +/-0.5mm;
Standard: ASME;
Connection: Welding;
Shape: Equal;
Head Code: Round;
Angle: 90 Degree;
Wall Thickness: Sch80;
Technics: Forged;
Color: Silver;
Warranty: 1 Year;
Pressure: 3000lb, 6000lb, 9000lb;
Production Standard: ASME B16.11-2016;
Lead Time: 25 to 35 Days;
Delivery: by Sea, by Air and by Express;
Applications: Petroleum, Chemical, Machinery, Boiler;
Certificate: CE/PED/ISO;
Surface: Oil Coating/Hot-DIP Galvanzied;
|