Specification |
Standard: GB;
Tolerance: +/-0.10mm;
Surface Treatment: Powder Coated;
Machining Method: Welding;
Material: Stainless Steel;
Items Name: Metal Stamping Bending Welding Service Parts;
Thickness: 0.5mm-20mm;
Color: Powder Coating;
Edge: Without Sharping;
OEM/ODM Service: Yes;
Precision: +-0.05mm;
Process 1: Drawing, Open Tooling;
Process 2: Stamping;
Process 3: Fix The Burr;
Process 4: Surface Treatment Zinc Plating,Anodizing, Chrome P;
Process 5: QC and Packing;
OEM Experiences: 12 Years;
Business Type: Sheet Metal Fabricator;
Hole: Taping;
Drawing Size: Yes;
|
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.10mm;
Surface Treatment: Powder Coated;
Machining Method: Laser Cutting;
Material: Stainless Steel;
Product Name: Stainless Steel CNC Machining Fabrication Machinin;
Thickness: as Per Demand;
Quality: 100% Inspection;
|
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.01mm;
Surface Treatment: Powder Coating,Galvanized,Anodizing,E-Coating;
Machining Method: Stamping,Punching,Bending,Forming,Laser Cutting;
Material: Ss,Spgc,Secc,SGCC,Aluminum,Brass,;
Material Thickness: 0.1-10mm;
Quality Control: Control Plan,Cpk,Flow Chart,Pfema;
Advantage: Precise Stamping Parts;
Equipment 1: Laser Cutting Machine,Hydraulic Press M;
Equipment 2: Bending Machine,Pneumatic Press Machine;
Inspection: Isir, in-Process, Final Inspection;
|
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.01mm;
Surface Treatment: Powder Coating,Galvanized,Anodizing,E-Coating;
Machining Method: Stamping,Punching,Bending,Forming,Laser Cutting;
Material: Ss,Spgc,Secc,SGCC,Aluminum,Brass,;
Material Thickness: 0.1-10mm;
Quality Control: Control Plan,Cpk,Flow Chart,Pfema;
Advantage: Precise Stamping Parts;
Inspection: Isir, in-Process, Final Inspection;
Inspection Tools: CMM, Gauges, Indicators, Projector;
|
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: 0.01mm;
Surface Treatment: Powder Coated;
Machining Method: CNC Stamping;
Material: Stainless Steel;
Material Thickness: 1--8mm;
Color: as Per Your Request;
Lead Time: 30--50 Days;
Certificates: ISO 9001, Ts16949;
Item: Carbon Steel Welding Sheet Metal Fabrication;
|