Specification |
Casting Method: Directional Crystallization;
Process: Lost Wax Casting;
Molding Technics: /Precision Casting;
Application: Machinery Parts;
Material: Carbon Steel;
Surface Preparation: Spray-Paint;
Surface Roughness: Ra0.1;
Machining Tolerance: +/-0.02mm;
Standard: GB;
After-Sales Service: 1years;
Warranty: 1years;
The Use of Voltage: 380V;
Weight of Equipment: 6.0t;
|
Casting Method: pressure Crystallization;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Machinery Parts;
Material: Stainless Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra1.6;
Machining Tolerance: +/-0.02mm;
Standard: AISI;
Machining Facility: Mct+CNC;
NDT: Mt/Ut/PT;
Heat Treatment: Normalizing / Qt / Solution Treatment;
|
Casting Method: pressure Crystallization;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Machinery Parts;
Material: Stainless Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra1.6;
Machining Tolerance: +/-0.02mm;
Standard: AISI;
Machining Facility: Mct+CNC;
NDT: Mt/Ut/PT;
Heat Treatment: Normalizing / Qt / Solution Treatment;
|
Casting Method: Directional Crystallization;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Machinery Parts;
Material: Stainless Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra1.6;
Machining Tolerance: +/-0.10mm;
Standard: GB;
Weight: 10g-100kg;
Surface Treatment: Burring, Polishing, Shot Blasting, Sandblasting;
Technology: Investment Casting, Lost Wax Casting, Die Casting;
Test Equipment: Coordinate Measuring Machine, X-ray Tester;
Usage: Engineering Parts, Household Appliance;
Mould+Sample Time: 15-25days;
Lead Time: 25-35days;
Inspection: 100%;
|
Casting Method: Directional Crystallization;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Machinery Parts;
Material: Stainless Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra1.6;
Machining Tolerance: +/-0.10mm;
Standard: GB;
Weight: 10g-100kg;
Surface Treatment: Burring, Polishing, Shot Blasting, Sandblasting;
Technology: Investment Casting, Lost Wax Casting, Die Casting;
Test Equipment: Coordinate Measuring Machine, X-ray Tester;
Usage: Engineering Parts, Household Appliance;
Mould+Sample Time: 15-25days;
Lead Time: 25-35days;
Inspection: 100%;
|